Evaluation of EPB Shield Excavation Impact on Deformations of Surrounding Ground
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F16%3A00302446" target="_blank" >RIV/68407700:21110/16:00302446 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Evaluation of EPB Shield Excavation Impact on Deformations of Surrounding Ground
Popis výsledku v původním jazyce
The tunnel design practice requires a proper evaluation of ground surface settlements. The factors influencing the ground surface settlemets are associated with the geological conditions, the tunnel profile and depth, the construstion method, tunnel face support, etc. the paper is focused on the settlement prediction. Analytical solutions and numerical modelling can be used for this purpose. Verification of available methods is done using monitoring results of the Prague metro VA excavation. Running tunnels of this construction were excavated using two EPB shields. Available analytical methods (e.g. proposed by O´Reilly and New or Peck and Schmidt) and numerical modelling (FEM using software PLAXIS) were used to evaluate settlement of the cross-section km 14,7. Results of calculations were compared to the results of monitoring.
Název v anglickém jazyce
Evaluation of EPB Shield Excavation Impact on Deformations of Surrounding Ground
Popis výsledku anglicky
The tunnel design practice requires a proper evaluation of ground surface settlements. The factors influencing the ground surface settlemets are associated with the geological conditions, the tunnel profile and depth, the construstion method, tunnel face support, etc. the paper is focused on the settlement prediction. Analytical solutions and numerical modelling can be used for this purpose. Verification of available methods is done using monitoring results of the Prague metro VA excavation. Running tunnels of this construction were excavated using two EPB shields. Available analytical methods (e.g. proposed by O´Reilly and New or Peck and Schmidt) and numerical modelling (FEM using software PLAXIS) were used to evaluate settlement of the cross-section km 14,7. Results of calculations were compared to the results of monitoring.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
JM - Inženýrské stavitelství
OECD FORD obor
—
Návaznosti výsledku
Projekt
<a href="/cs/project/TE01020168" target="_blank" >TE01020168: Centrum pro efektivní a udržitelnou dopravní infrastrukturu (CESTI)</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2016
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Sborník příspěvků 21.mezinárodního semináře Zpevňování, těsnění a kotvení horninového masivu a stavebních konstrukcí 2016
ISBN
978-80-248-3890-8
ISSN
—
e-ISSN
—
Počet stran výsledku
5
Strana od-do
89-93
Název nakladatele
Vysoká škola báňská - Technická univerzita Ostrava
Místo vydání
Ostrava
Místo konání akce
Ostrava
Datum konání akce
18. 2. 2016
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—