Evaluation of Maturity of BIM Tools across Different Software Platforms
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F16%3A00305507" target="_blank" >RIV/68407700:21110/16:00305507 - isvavai.cz</a>
Výsledek na webu
<a href="http://www.sciencedirect.com/science/article/pii/S1877705816339893" target="_blank" >http://www.sciencedirect.com/science/article/pii/S1877705816339893</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1016/j.proeng.2016.11.648" target="_blank" >10.1016/j.proeng.2016.11.648</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Evaluation of Maturity of BIM Tools across Different Software Platforms
Popis výsledku v původním jazyce
The paper evaluates usability of information modelling tools on the most common operating systems (Windows, Linux, Mac OS X). Stages of BIM maturity and availability of building information modelling tools vary dramatically on these platforms. Paper compares the current software tools, and how they can be used in the building process. The list of attributes that mature software platform should accommodate was created. Evaluation criteria are determined by specific needs of the various participants of the building process. This leads to the successful project completion and subsequent management of the lifecycle of the building. 2016 The Authors. Published by Elsevier Ltd.
Název v anglickém jazyce
Evaluation of Maturity of BIM Tools across Different Software Platforms
Popis výsledku anglicky
The paper evaluates usability of information modelling tools on the most common operating systems (Windows, Linux, Mac OS X). Stages of BIM maturity and availability of building information modelling tools vary dramatically on these platforms. Paper compares the current software tools, and how they can be used in the building process. The list of attributes that mature software platform should accommodate was created. Evaluation criteria are determined by specific needs of the various participants of the building process. This leads to the successful project completion and subsequent management of the lifecycle of the building. 2016 The Authors. Published by Elsevier Ltd.
Klasifikace
Druh
J<sub>x</sub> - Nezařazeno - Článek v odborném periodiku (Jimp, Jsc a Jost)
CEP obor
JN - Stavebnictví
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2016
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název periodika
Procedia Engineering
ISSN
1877-7058
e-ISSN
—
Svazek periodika
164
Číslo periodika v rámci svazku
12
Stát vydavatele periodika
NL - Nizozemsko
Počet stran výsledku
6
Strana od-do
481-486
Kód UT WoS článku
000391590900064
EID výsledku v databázi Scopus
2-s2.0-85007007344