Výhody informačního modelu budov ve spojení s matematickým model na čistírně odpadních vod
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F17%3A00313329" target="_blank" >RIV/68407700:21110/17:00313329 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
čeština
Název v původním jazyce
Výhody informačního modelu budov ve spojení s matematickým model na čistírně odpadních vod
Popis výsledku v původním jazyce
Today Building informational model (BIM) is everywhere discussed in civil engineering area. Lot of articles highlighted BIMs advantages in designing, planning and constructing. Bbut the use of BIM for the design and optimization of the flow of water in the water management structures remained far outside attention. One of the reasons is little usage of BIM in the water management sector, because this sector was not sufficiently tailored programs. Another reason is little usage of the simulation tools for more complex flow (CFD). Properly connected BIM and CFD may not only save time by sharing the 3D geometry. Integrating of the simulation tool can be effectively involved in the design at the appropriate time. It can solve geometry modifications and their collision effectively thanks connections than in “classic design”. The process of the simulation and design can be also automating.
Název v anglickém jazyce
90/5000 Benefits of building information model in conjunction with mathematical model for sewage treatment plant
Popis výsledku anglicky
Today Building informational model (BIM) is everywhere discussed in civil engineering area. Lot of articles highlighted BIMs advantages in designing, planning and constructing. Bbut the use of BIM for the design and optimization of the flow of water in the water management structures remained far outside attention. One of the reasons is little usage of BIM in the water management sector, because this sector was not sufficiently tailored programs. Another reason is little usage of the simulation tools for more complex flow (CFD). Properly connected BIM and CFD may not only save time by sharing the 3D geometry. Integrating of the simulation tool can be effectively involved in the design at the appropriate time. It can solve geometry modifications and their collision effectively thanks connections than in “classic design”. The process of the simulation and design can be also automating.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
20102 - Construction engineering, Municipal and structural engineering
Návaznosti výsledku
Projekt
<a href="/cs/project/TE02000077" target="_blank" >TE02000077: Inteligentní Regiony - Informační modelování budov a sídel, technologie a infrastruktura pro udržitelný rozvoj</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2017
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Sborník příspěvků SVK STOKA 2017
ISBN
978-80-01-06121-3
ISSN
—
e-ISSN
—
Počet stran výsledku
6
Strana od-do
—
Název nakladatele
České vysoké učení technické v Praze
Místo vydání
Praha
Místo konání akce
Telč
Datum konání akce
8. 6. 2017
Typ akce podle státní příslušnosti
EUR - Evropská akce
Kód UT WoS článku
—