Pre-Cast Concrete, a Key Option for the Reconstruction Phase after War
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F17%3A00314195" target="_blank" >RIV/68407700:21110/17:00314195 - isvavai.cz</a>
Výsledek na webu
<a href="https://apps.webofknowledge.com/full_record.do?product=WOS&search_mode=GeneralSearch&qid=17&SID=D5yFV1vDiGvQNa29Pf3&page=1&doc=1" target="_blank" >https://apps.webofknowledge.com/full_record.do?product=WOS&search_mode=GeneralSearch&qid=17&SID=D5yFV1vDiGvQNa29Pf3&page=1&doc=1</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1016/j.proeng.2017.08.074" target="_blank" >10.1016/j.proeng.2017.08.074</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Pre-Cast Concrete, a Key Option for the Reconstruction Phase after War
Popis výsledku v původním jazyce
These days Syria is concerned in the development of integrated strategy, starting with a provision of regional, structural and organizational planning for the affected areas, followed by the architectural and construction and environmental studies, etc. This strategy is achieved through the preparation of detailed plans and programs necessary for the implementation of public and private projects that achieve the objective of development and reconstruction. This study includes a range of plans that must overlaps and integrates with each other to produce reconstruction operations. Work team must be involved in the implementation of these plans. The work team composed of officials and experts, technicians and consultants, and bound together through a flexible structure consisted of a group of sub-committees that are related to a higher body for reconstruction. In the stage of the housing plan, researches were done in order to assess the reality of the construction of buildings in Syria, and compared with the concepts and the construction industry characteristics (IBS), and determine the Syrian experiment site regarding to these concepts, as well as evaluating the factors affecting this industry, and proposals to apply it in reconstruction stage. Cast-in-place concrete in the case of the reinforced walls, got 13.1%, while in the case of the framework structure was 34%, and templates tunnelling was 64%, composite order (pre-cast and Cast-in-place concrete) was 61%, composite order (concrete and metallic) was 67.25% , and the precast concrete was from 82% up to 86%.
Název v anglickém jazyce
Pre-Cast Concrete, a Key Option for the Reconstruction Phase after War
Popis výsledku anglicky
These days Syria is concerned in the development of integrated strategy, starting with a provision of regional, structural and organizational planning for the affected areas, followed by the architectural and construction and environmental studies, etc. This strategy is achieved through the preparation of detailed plans and programs necessary for the implementation of public and private projects that achieve the objective of development and reconstruction. This study includes a range of plans that must overlaps and integrates with each other to produce reconstruction operations. Work team must be involved in the implementation of these plans. The work team composed of officials and experts, technicians and consultants, and bound together through a flexible structure consisted of a group of sub-committees that are related to a higher body for reconstruction. In the stage of the housing plan, researches were done in order to assess the reality of the construction of buildings in Syria, and compared with the concepts and the construction industry characteristics (IBS), and determine the Syrian experiment site regarding to these concepts, as well as evaluating the factors affecting this industry, and proposals to apply it in reconstruction stage. Cast-in-place concrete in the case of the reinforced walls, got 13.1%, while in the case of the framework structure was 34%, and templates tunnelling was 64%, composite order (pre-cast and Cast-in-place concrete) was 61%, composite order (concrete and metallic) was 67.25% , and the precast concrete was from 82% up to 86%.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
20101 - Civil engineering
Návaznosti výsledku
Projekt
—
Návaznosti
S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2017
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Procedia Engineering
ISBN
—
ISSN
1877-7058
e-ISSN
1877-7058
Počet stran výsledku
9
Strana od-do
211-219
Název nakladatele
Elsevier B.V.
Místo vydání
Amsterdam
Místo konání akce
Primosten
Datum konání akce
19. 6. 2017
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
000418465300028