Process of Matching Work Items between BIM Model and Cost Estimating Software.
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F18%3A00323013" target="_blank" >RIV/68407700:21110/18:00323013 - isvavai.cz</a>
Výsledek na webu
<a href="http://www.tf.llu.lv/conference/proceedings2018/Papers/N423.pdf" target="_blank" >http://www.tf.llu.lv/conference/proceedings2018/Papers/N423.pdf</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.22616/ERDev2018.17.N423" target="_blank" >10.22616/ERDev2018.17.N423</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Process of Matching Work Items between BIM Model and Cost Estimating Software.
Popis výsledku v původním jazyce
This article is focused on the process of matching work items into an organized structure in order to semi-automatically identify work items and link them between BIModel and cost estimating software. Several sources are suggesting a computer aided cost estimation based on historical cost data, which is a desired method of cost estimation. However, it is only achievable, if cost data are collected in an organized way and if format of cost data is structured according with defined standards. Those standards can be internal standards of a company, or national, even international standards that clearly define the structure of work items. Since work items are generally named differently throughout various bills of quantities, it should be more suitable to mark and recognize work items by numbered codes that will be defined specifically for each and every work item. The question is, what level of detail of a particular work item should these numbered codes reflect.
Název v anglickém jazyce
Process of Matching Work Items between BIM Model and Cost Estimating Software.
Popis výsledku anglicky
This article is focused on the process of matching work items into an organized structure in order to semi-automatically identify work items and link them between BIModel and cost estimating software. Several sources are suggesting a computer aided cost estimation based on historical cost data, which is a desired method of cost estimation. However, it is only achievable, if cost data are collected in an organized way and if format of cost data is structured according with defined standards. Those standards can be internal standards of a company, or national, even international standards that clearly define the structure of work items. Since work items are generally named differently throughout various bills of quantities, it should be more suitable to mark and recognize work items by numbered codes that will be defined specifically for each and every work item. The question is, what level of detail of a particular work item should these numbered codes reflect.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
20101 - Civil engineering
Návaznosti výsledku
Projekt
—
Návaznosti
S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2018
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Engineering for Rural Development, Proceedings of 17th International Scientific Conference
ISBN
—
ISSN
1691-5976
e-ISSN
1691-5976
Počet stran výsledku
9
Strana od-do
856-864
Název nakladatele
Latvia University of Agriculture
Místo vydání
Jelgava
Místo konání akce
Jelgava
Datum konání akce
22. 5. 2018
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—