EXCEEDING OF APPROVED BUDGETS OF PUBLIC CONSTRUCTION PROJECTS, ACCORDING TO CATEGORIES OF BUILDINGS
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F18%3A00329205" target="_blank" >RIV/68407700:21110/18:00329205 - isvavai.cz</a>
Výsledek na webu
<a href="http://www.conference-cm.com" target="_blank" >http://www.conference-cm.com</a>
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
EXCEEDING OF APPROVED BUDGETS OF PUBLIC CONSTRUCTION PROJECTS, ACCORDING TO CATEGORIES OF BUILDINGS
Popis výsledku v původním jazyce
This article presents results of an analysis of key drawbacks in financing of construction projects from public sources in the Czech Republic. A sample of 194 public buildings that were constructed between the years 2008 and 2018 were categorized according to their purpose, architectural similarity and building technology and were analyzed for the most frequent causes of the delay in construction completion and increase in a final cost. More specifically, the buildings were classified into four categories: 1) transport structures, e.g. roads, motorways, etc., 2) water management structures, e.g. ponds, watercourses, etc., 3) technological structures, e.g. power plants, sewage treatment plants, etc., and 4) other ground structures, such as schools, apartment buildings etc. In summary, the most frequent reasons for non-compliance with the project budget are, for example, extra work, insufficient geological survey of the building, errors and changes in project documentation, budget deficiencies, or changes in technology during construction.
Název v anglickém jazyce
EXCEEDING OF APPROVED BUDGETS OF PUBLIC CONSTRUCTION PROJECTS, ACCORDING TO CATEGORIES OF BUILDINGS
Popis výsledku anglicky
This article presents results of an analysis of key drawbacks in financing of construction projects from public sources in the Czech Republic. A sample of 194 public buildings that were constructed between the years 2008 and 2018 were categorized according to their purpose, architectural similarity and building technology and were analyzed for the most frequent causes of the delay in construction completion and increase in a final cost. More specifically, the buildings were classified into four categories: 1) transport structures, e.g. roads, motorways, etc., 2) water management structures, e.g. ponds, watercourses, etc., 3) technological structures, e.g. power plants, sewage treatment plants, etc., and 4) other ground structures, such as schools, apartment buildings etc. In summary, the most frequent reasons for non-compliance with the project budget are, for example, extra work, insufficient geological survey of the building, errors and changes in project documentation, budget deficiencies, or changes in technology during construction.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
20101 - Civil engineering
Návaznosti výsledku
Projekt
—
Návaznosti
S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2018
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Construction Maeconomics Conference (2018), Conference Proceedings
ISBN
978-80-01-06522-8
ISSN
—
e-ISSN
—
Počet stran výsledku
6
Strana od-do
—
Název nakladatele
ČVUT, Fakulta stavební, Katedra ekonomiky a řízení ve stavebnictví
Místo vydání
Praha
Místo konání akce
Praha
Datum konání akce
17. 10. 2018
Typ akce podle státní příslušnosti
EUR - Evropská akce
Kód UT WoS článku
—