Decision making of municipalities in the current economic situation
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F18%3A00329658" target="_blank" >RIV/68407700:21110/18:00329658 - isvavai.cz</a>
Výsledek na webu
<a href="http://www.conference-cm.com" target="_blank" >http://www.conference-cm.com</a>
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Decision making of municipalities in the current economic situation
Popis výsledku v původním jazyce
The investor, the designer, and the Building authority are subjects who decide about placing new buildings and approval of buildings. There are two possibilities of the placing: either on a greenfield or on a so-called brownfield. Each project has a number of parameters. Each subject uses parameters to decide on the eventual implementation. The investor wants often the lowest prize. The designer wants to meet all the requirements of the investor, and the Building authority permits construction in accordance with the laws and documents issued. Representatives of municipalities must respect all the requirements of the Building Act, including related decrees. The economic situation in the Czech Republic is at a higher level every year, and this is also reflected in the construction. Every year the number of building permits increases, and the total amount of construction works in the S-value is increasing. On the other hand, the number of construction employees is decreasing. This is the reason why the so-called Construction 4.0. is started to be used. The new concept Construction 4.0. can achieve higher levels in towns and cities, avoids construction of new brownfields or the use of existing ones. Even the government inclines to reduce and meaningfully utilize the current brownfields, incl. housing construction.
Název v anglickém jazyce
Decision making of municipalities in the current economic situation
Popis výsledku anglicky
The investor, the designer, and the Building authority are subjects who decide about placing new buildings and approval of buildings. There are two possibilities of the placing: either on a greenfield or on a so-called brownfield. Each project has a number of parameters. Each subject uses parameters to decide on the eventual implementation. The investor wants often the lowest prize. The designer wants to meet all the requirements of the investor, and the Building authority permits construction in accordance with the laws and documents issued. Representatives of municipalities must respect all the requirements of the Building Act, including related decrees. The economic situation in the Czech Republic is at a higher level every year, and this is also reflected in the construction. Every year the number of building permits increases, and the total amount of construction works in the S-value is increasing. On the other hand, the number of construction employees is decreasing. This is the reason why the so-called Construction 4.0. is started to be used. The new concept Construction 4.0. can achieve higher levels in towns and cities, avoids construction of new brownfields or the use of existing ones. Even the government inclines to reduce and meaningfully utilize the current brownfields, incl. housing construction.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
20101 - Civil engineering
Návaznosti výsledku
Projekt
—
Návaznosti
I - Institucionalni podpora na dlouhodoby koncepcni rozvoj vyzkumne organizace
Ostatní
Rok uplatnění
2018
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Construction Maeconomics Conference (2018), Conference Proceedings
ISBN
978-80-01-06522-8
ISSN
—
e-ISSN
—
Počet stran výsledku
7
Strana od-do
—
Název nakladatele
ČVUT, Fakulta stavební, Katedra ekonomiky a řízení ve stavebnictví
Místo vydání
Praha
Místo konání akce
Praha
Datum konání akce
17. 10. 2018
Typ akce podle státní příslušnosti
EUR - Evropská akce
Kód UT WoS článku
—