USING BUILDING INFORMATION MODELLING (BIM) IN CONSTRUCTION BUDGET: BENEFITS AND BARRIERS
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F19%3A00332167" target="_blank" >RIV/68407700:21110/19:00332167 - isvavai.cz</a>
Výsledek na webu
<a href="http://www.tf.llu.lv/conference/proceedings2019/Papers/N377.pdf" target="_blank" >http://www.tf.llu.lv/conference/proceedings2019/Papers/N377.pdf</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.22616/ERDev2019.18.N377" target="_blank" >10.22616/ERDev2019.18.N377</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
USING BUILDING INFORMATION MODELLING (BIM) IN CONSTRUCTION BUDGET: BENEFITS AND BARRIERS
Popis výsledku v původním jazyce
This article shows ways in which BIM data can be used to create construction budgets item by item. It describes conditions which need to be met in order to use BIM 5D model in its full value – i.e. this article deals primarily with documents used for creation of a BIM model, with their graphic and non-graphic specifications. The article shows a process based on keeping a close correspondence between construction budget items and BIM model elements. To make it clearer, let us state that there exists a classification system which matches each model element with an identifier, making it possible to link such element to a budget item or several items. In principle, the most important part is matching a construction element with an identifier, which can be “read” by pricing software. That makes the software able to transform construction elements into budget units. Case study shows an analysis of current situation using information models of two administrative buildings (currently under construction) and links these models to construction budgets. The transferred data made up for more than sixty per cent of construction budget, which means that four fifths of total budget could be predicted from automated calculations.
Název v anglickém jazyce
USING BUILDING INFORMATION MODELLING (BIM) IN CONSTRUCTION BUDGET: BENEFITS AND BARRIERS
Popis výsledku anglicky
This article shows ways in which BIM data can be used to create construction budgets item by item. It describes conditions which need to be met in order to use BIM 5D model in its full value – i.e. this article deals primarily with documents used for creation of a BIM model, with their graphic and non-graphic specifications. The article shows a process based on keeping a close correspondence between construction budget items and BIM model elements. To make it clearer, let us state that there exists a classification system which matches each model element with an identifier, making it possible to link such element to a budget item or several items. In principle, the most important part is matching a construction element with an identifier, which can be “read” by pricing software. That makes the software able to transform construction elements into budget units. Case study shows an analysis of current situation using information models of two administrative buildings (currently under construction) and links these models to construction budgets. The transferred data made up for more than sixty per cent of construction budget, which means that four fifths of total budget could be predicted from automated calculations.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
20101 - Civil engineering
Návaznosti výsledku
Projekt
—
Návaznosti
S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2019
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Engineering for Rural Development, Proceedings of 18th International Scientific Conference
ISBN
—
ISSN
1691-5976
e-ISSN
1691-5976
Počet stran výsledku
8
Strana od-do
1699-1706
Název nakladatele
Latvia University of Agriculture
Místo vydání
Jelgava
Místo konání akce
Jelgava
Datum konání akce
22. 5. 2019
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
000482103500249