Specifications of m&e requirements in the bim model in the context of use for facility management
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F19%3A00332174" target="_blank" >RIV/68407700:21110/19:00332174 - isvavai.cz</a>
Výsledek na webu
<a href="https://doi.org/10.1201/9780429021596" target="_blank" >https://doi.org/10.1201/9780429021596</a>
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Specifications of m&e requirements in the bim model in the context of use for facility management
Popis výsledku v původním jazyce
The paper addresses the specific requirements of the BIM model that is implemented in the CAFM system, and envisions subsequent implementation for facility management. For facility management, it is important that the BIM model contains comprehensive information and data on both the construction and the technological building systems (M&E). The specifics of the M&E parts in the BIM model to be used in the operational phase of the construction project need to be determined in advance in order to input relevant data into the model during the preparatory and construction phase. This prevents inaccuracies between the project documentation and the actual status or loss of data during the classical management of the construction process and subsequent commissioning. In this paper, the structure of the data and information about the technological systems of the building to be included in the BIM model implemented in facility management are determined.
Název v anglickém jazyce
Specifications of m&e requirements in the bim model in the context of use for facility management
Popis výsledku anglicky
The paper addresses the specific requirements of the BIM model that is implemented in the CAFM system, and envisions subsequent implementation for facility management. For facility management, it is important that the BIM model contains comprehensive information and data on both the construction and the technological building systems (M&E). The specifics of the M&E parts in the BIM model to be used in the operational phase of the construction project need to be determined in advance in order to input relevant data into the model during the preparatory and construction phase. This prevents inaccuracies between the project documentation and the actual status or loss of data during the classical management of the construction process and subsequent commissioning. In this paper, the structure of the data and information about the technological systems of the building to be included in the BIM model implemented in facility management are determined.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
20101 - Civil engineering
Návaznosti výsledku
Projekt
—
Návaznosti
S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2019
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Advances and Trends in Engineering Sciences and Technologies III: Proceedings of the 3rd International Conference on Engineering Sciences and Technologies
ISBN
9780367075095
ISSN
—
e-ISSN
—
Počet stran výsledku
6
Strana od-do
425-430
Název nakladatele
CRC Press
Místo vydání
Boca Raton
Místo konání akce
Tatranské Matliare
Datum konání akce
12. 9. 2018
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—