Connecting BIM and LCA: The Case Study of an Experimental Residential Building
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F19%3A00332903" target="_blank" >RIV/68407700:21110/19:00332903 - isvavai.cz</a>
Nalezeny alternativní kódy
RIV/68407700:21720/19:00332903
Výsledek na webu
<a href="https://iopscience.iop.org/article/10.1088/1755-1315/323/1/012106/pdf" target="_blank" >https://iopscience.iop.org/article/10.1088/1755-1315/323/1/012106/pdf</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1088/1755-1315/323/1/012106" target="_blank" >10.1088/1755-1315/323/1/012106</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Connecting BIM and LCA: The Case Study of an Experimental Residential Building
Popis výsledku v původním jazyce
The aim of this paper is to present application of BIM models for the complex quality assessment and environmental analysis based on LCA. An experimental two storey building of TiCo Project representing a full scale part of a real multi-storey residential building has been used for this case study. The presented BIM model contains all relevant environmental characteristics and it will be used for environmental analysis, coordination, and operation (e.g. real-time data analysis from the sensors). Theoretical part covers development of the methodology for data transfer from BIM model to assessment scheme based on SBToolCZ, which is a national tool for building sustainability certification in the Czech Republic. Next step will be focused on describing connection of LCA and the BIM model databases and mapping data between them. Case study is focused on utilisation of BIM model with all relevant environmental characteristics for LCA analysis. All changes during construction phase and their impact on environmental analysis and LCA will be monitored and assessed.
Název v anglickém jazyce
Connecting BIM and LCA: The Case Study of an Experimental Residential Building
Popis výsledku anglicky
The aim of this paper is to present application of BIM models for the complex quality assessment and environmental analysis based on LCA. An experimental two storey building of TiCo Project representing a full scale part of a real multi-storey residential building has been used for this case study. The presented BIM model contains all relevant environmental characteristics and it will be used for environmental analysis, coordination, and operation (e.g. real-time data analysis from the sensors). Theoretical part covers development of the methodology for data transfer from BIM model to assessment scheme based on SBToolCZ, which is a national tool for building sustainability certification in the Czech Republic. Next step will be focused on describing connection of LCA and the BIM model databases and mapping data between them. Case study is focused on utilisation of BIM model with all relevant environmental characteristics for LCA analysis. All changes during construction phase and their impact on environmental analysis and LCA will be monitored and assessed.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
20101 - Civil engineering
Návaznosti výsledku
Projekt
Výsledek vznikl pri realizaci vícero projektů. Více informací v záložce Projekty.
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2019
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
SUSTAINABLE BUILT ENVIRONMENT D-A-CH CONFERENCE 2019 (SBE19 Graz)
ISBN
—
ISSN
1755-1307
e-ISSN
1755-1315
Počet stran výsledku
7
Strana od-do
—
Název nakladatele
Graz University of Technology
Místo vydání
Graz
Místo konání akce
Graz
Datum konání akce
11. 9. 2019
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—