Realization Processes of Road-building Projects in the Czech Republic: Necessary Information to Execute Processes
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F19%3A00333620" target="_blank" >RIV/68407700:21110/19:00333620 - isvavai.cz</a>
Výsledek na webu
<a href="https://iopscience.iop.org/article/10.1088/1757-899X/603/3/032002" target="_blank" >https://iopscience.iop.org/article/10.1088/1757-899X/603/3/032002</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1088/1757-899X/603/3/032002" target="_blank" >10.1088/1757-899X/603/3/032002</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Realization Processes of Road-building Projects in the Czech Republic: Necessary Information to Execute Processes
Popis výsledku v původním jazyce
Road buildings projects are unique for their typical aspects. These typical aspects are the long-term preparation process (app. 16 years) and the construction phase (app. 4 years). Construction of the road building influences a large area in the country and has a big impact on the environment. Construction road building projects very often suffer from project delays and increasing budget because of many causes. Paper analyses process of obtaining information and other conditions for realization of the road-building projects. This paper describes the main road building project actors and main time schedule delays. After that, the process is analyzed and necessary information are identified. Finally, other necessary conditions for realization process are identified. Realization of the road-building process diagram (focused on documentation) was created and verbally evaluated.
Název v anglickém jazyce
Realization Processes of Road-building Projects in the Czech Republic: Necessary Information to Execute Processes
Popis výsledku anglicky
Road buildings projects are unique for their typical aspects. These typical aspects are the long-term preparation process (app. 16 years) and the construction phase (app. 4 years). Construction of the road building influences a large area in the country and has a big impact on the environment. Construction road building projects very often suffer from project delays and increasing budget because of many causes. Paper analyses process of obtaining information and other conditions for realization of the road-building projects. This paper describes the main road building project actors and main time schedule delays. After that, the process is analyzed and necessary information are identified. Finally, other necessary conditions for realization process are identified. Realization of the road-building process diagram (focused on documentation) was created and verbally evaluated.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
20101 - Civil engineering
Návaznosti výsledku
Projekt
—
Návaznosti
S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2019
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
IOP Conf. Series: Materials Science and Engineering
ISBN
—
ISSN
1757-899X
e-ISSN
1757-899X
Počet stran výsledku
6
Strana od-do
—
Název nakladatele
IOP Publishing Ltd.
Místo vydání
Bristol
Místo konání akce
Praha
Datum konání akce
17. 6. 2019
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—