PREPARATIONS FOR REMEDIATION OF A FORMER SURFACE MINE – TECHNICAL RECLAMATION AREA
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F19%3A00337930" target="_blank" >RIV/68407700:21110/19:00337930 - isvavai.cz</a>
Výsledek na webu
<a href="https://doi.org/10.14311/APP.2019.23.0014" target="_blank" >https://doi.org/10.14311/APP.2019.23.0014</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.14311/APP.2019.23.0014" target="_blank" >10.14311/APP.2019.23.0014</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
PREPARATIONS FOR REMEDIATION OF A FORMER SURFACE MINE – TECHNICAL RECLAMATION AREA
Popis výsledku v původním jazyce
The reclamation area for secondary float energy by-products is located on a spoil heap, 45 m thick and 30 years old (mostly claystone with high plasticity). When depositing a first 18 m high stack, it was necessary to verify stability and to analyse deformations during the reclaimer operation. The stability and deformation depend on the shallow groundwater level. Therefore, it was necessary to propose a technical solution for drainage of the interest structure. It can be divided into two parts: drainage of surface water and drainage of the shallow underground water. It is a complex solution of the entire construction that would not be possible without long-term monitoring of the construction and field mapping. Realization of the proposed facilities will increase the stability of the reclamation area and it will be possible to continue with remediation of a former surface mine.
Název v anglickém jazyce
PREPARATIONS FOR REMEDIATION OF A FORMER SURFACE MINE – TECHNICAL RECLAMATION AREA
Popis výsledku anglicky
The reclamation area for secondary float energy by-products is located on a spoil heap, 45 m thick and 30 years old (mostly claystone with high plasticity). When depositing a first 18 m high stack, it was necessary to verify stability and to analyse deformations during the reclaimer operation. The stability and deformation depend on the shallow groundwater level. Therefore, it was necessary to propose a technical solution for drainage of the interest structure. It can be divided into two parts: drainage of surface water and drainage of the shallow underground water. It is a complex solution of the entire construction that would not be possible without long-term monitoring of the construction and field mapping. Realization of the proposed facilities will increase the stability of the reclamation area and it will be possible to continue with remediation of a former surface mine.
Klasifikace
Druh
J<sub>ost</sub> - Ostatní články v recenzovaných periodicích
CEP obor
—
OECD FORD obor
20701 - Environmental and geological engineering, geotechnics
Návaznosti výsledku
Projekt
—
Návaznosti
I - Institucionalni podpora na dlouhodoby koncepcni rozvoj vyzkumne organizace
Ostatní
Rok uplatnění
2019
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název periodika
Acta Polytechnica
ISSN
1210-2709
e-ISSN
1805-2363
Svazek periodika
2019
Číslo periodika v rámci svazku
23
Stát vydavatele periodika
CZ - Česká republika
Počet stran výsledku
6
Strana od-do
14-19
Kód UT WoS článku
—
EID výsledku v databázi Scopus
2-s2.0-85113798703