Life Cycle Costing of Public Construction Projects
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F19%3A00348390" target="_blank" >RIV/68407700:21110/19:00348390 - isvavai.cz</a>
Výsledek na webu
<a href="http://dx.doi.org/10.1088/1755-1315/290/1/012060" target="_blank" >http://dx.doi.org/10.1088/1755-1315/290/1/012060</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1088/1755-1315/290/1/012060" target="_blank" >10.1088/1755-1315/290/1/012060</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Life Cycle Costing of Public Construction Projects
Popis výsledku v původním jazyce
The purpose of this paper is to highlight the role of life cycle costing in the preparation phase of public construction projects. Life cycle costing is a method of economic analysis directed at all costs related to constructing, operating, and maintaining a construction project over a defined period of time. In the early phase of construction projects, an enormous benefit in life cycle costing can be achieved. The commonly used construction cost minimization approach should be substituted for life cycle cost optimization. In order to gain the maximum value for money, all costs incurred over the whole life span must be estimated. The optimization of the life cycle costs of a construction project is essential for a complex decision making process. All taken into consideration, the solution with the minimum value of life cycle costs can be chosen. Public investors are required to meet the objectives of sustainable building, and as a group they face limited financial resources and frequently a very strict institutional framework including procurement procedures. The quantification of life cycle costs, when deciding on a construction project, is required by the public sector in the Czech Republic. In addition, the estimated amount of life cycle costs has become a criterion in public tenders. The paper summarizes experience in building design valuation in terms of these life cycle costs.
Název v anglickém jazyce
Life Cycle Costing of Public Construction Projects
Popis výsledku anglicky
The purpose of this paper is to highlight the role of life cycle costing in the preparation phase of public construction projects. Life cycle costing is a method of economic analysis directed at all costs related to constructing, operating, and maintaining a construction project over a defined period of time. In the early phase of construction projects, an enormous benefit in life cycle costing can be achieved. The commonly used construction cost minimization approach should be substituted for life cycle cost optimization. In order to gain the maximum value for money, all costs incurred over the whole life span must be estimated. The optimization of the life cycle costs of a construction project is essential for a complex decision making process. All taken into consideration, the solution with the minimum value of life cycle costs can be chosen. Public investors are required to meet the objectives of sustainable building, and as a group they face limited financial resources and frequently a very strict institutional framework including procurement procedures. The quantification of life cycle costs, when deciding on a construction project, is required by the public sector in the Czech Republic. In addition, the estimated amount of life cycle costs has become a criterion in public tenders. The paper summarizes experience in building design valuation in terms of these life cycle costs.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
20101 - Civil engineering
Návaznosti výsledku
Projekt
—
Návaznosti
S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2019
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Central Europe towards Sustainable Building (CESB19)
ISBN
—
ISSN
1755-1307
e-ISSN
1755-1315
Počet stran výsledku
7
Strana od-do
—
Název nakladatele
IOP Publishing Ltd
Místo vydání
Bristol
Místo konání akce
Praha
Datum konání akce
2. 7. 2019
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—