Role of Geotechnical Engineering in BIM process modelling
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F21%3A00354957" target="_blank" >RIV/68407700:21110/21:00354957 - isvavai.cz</a>
Výsledek na webu
<a href="https://iopscience.iop.org/article/10.1088/1755-1315/727/1/012007" target="_blank" >https://iopscience.iop.org/article/10.1088/1755-1315/727/1/012007</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1088/1755-1315/727/1/012007" target="_blank" >10.1088/1755-1315/727/1/012007</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Role of Geotechnical Engineering in BIM process modelling
Popis výsledku v původním jazyce
BIM "Building Information Model" creates a significant step forward in the whole process of construction. The role of geotechnical engineering will be shown as for classical building engineering so for civil engineering structures. In the first case all upper structures are in interaction with ground (subsoil), when foundation structures are basic element of this interaction. The 3D Ground model and 3D Foundation structure model create therefore one of the first individual parametric elements around basic (coordinating) BIM model. Some specificity will be shown as the impact of step by step creation (nD dimension) of the Ground model for the earliest building conception. Roughly the same is valid for civil engineering structures. Some specificity will be shown for earth structures of transport engineering, as a selection of borrow pit, definition of soil compaction for fill, fill compaction or any other methods of soil improvement and its control as they create important elements for the safe and optimal embankment design and performance. Final 3D Ground model together with 3D Geotechnical structure model (real performance) create the important base for the future decision making, when some changes will occur.
Název v anglickém jazyce
Role of Geotechnical Engineering in BIM process modelling
Popis výsledku anglicky
BIM "Building Information Model" creates a significant step forward in the whole process of construction. The role of geotechnical engineering will be shown as for classical building engineering so for civil engineering structures. In the first case all upper structures are in interaction with ground (subsoil), when foundation structures are basic element of this interaction. The 3D Ground model and 3D Foundation structure model create therefore one of the first individual parametric elements around basic (coordinating) BIM model. Some specificity will be shown as the impact of step by step creation (nD dimension) of the Ground model for the earliest building conception. Roughly the same is valid for civil engineering structures. Some specificity will be shown for earth structures of transport engineering, as a selection of borrow pit, definition of soil compaction for fill, fill compaction or any other methods of soil improvement and its control as they create important elements for the safe and optimal embankment design and performance. Final 3D Ground model together with 3D Geotechnical structure model (real performance) create the important base for the future decision making, when some changes will occur.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
20101 - Civil engineering
Návaznosti výsledku
Projekt
—
Návaznosti
I - Institucionalni podpora na dlouhodoby koncepcni rozvoj vyzkumne organizace
Ostatní
Rok uplatnění
2021
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
IOP Conference Series: Earth and Environmental Science
ISBN
—
ISSN
1755-1307
e-ISSN
—
Počet stran výsledku
8
Strana od-do
1-8
Název nakladatele
IOP Publishing Ltd
Místo vydání
Bristol
Místo konání akce
Helsinky
Datum konání akce
18. 1. 2021
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
000775726500007