Risk Management Plan for Long-term Power Blackout for Temelin Nuclear Power Plant
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21110%2F22%3A00361388" target="_blank" >RIV/68407700:21110/22:00361388 - isvavai.cz</a>
Nalezeny alternativní kódy
RIV/68407700:21220/22:00361388
Výsledek na webu
<a href="https://doi.org/10.3850/978-981-18-5183-4_R18-03-079-cd" target="_blank" >https://doi.org/10.3850/978-981-18-5183-4_R18-03-079-cd</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.3850/978-981-18-5183-4_R18-03-079-cd" target="_blank" >10.3850/978-981-18-5183-4_R18-03-079-cd</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Risk Management Plan for Long-term Power Blackout for Temelin Nuclear Power Plant
Popis výsledku v původním jazyce
The critical process of nuclear power plant safety is the reactor cooling. Therefore, from safety reasons, it is also necessary to consider scenarios of impacts of low probable unacceptable disasters. Analysis of data on operation of nuclear power plants showed that one of problems that creates critical situations is a long-term power black-out. The article identifies the risks associated with the existing way of refilling the cooling water for cooling-down of the unit on Temelín nuclear power plant, in the long-term blackout. It analyzes operating conditions and identifies critical points of cooling water supply process at long-term power blackout, i.e. problems of critical safety function. Based on real data, the paper shows the risk management plan for re-sponse process to problems, using the feed and bleed method, for extreme accident scenario caused by long-term power blackout.
Název v anglickém jazyce
Risk Management Plan for Long-term Power Blackout for Temelin Nuclear Power Plant
Popis výsledku anglicky
The critical process of nuclear power plant safety is the reactor cooling. Therefore, from safety reasons, it is also necessary to consider scenarios of impacts of low probable unacceptable disasters. Analysis of data on operation of nuclear power plants showed that one of problems that creates critical situations is a long-term power black-out. The article identifies the risks associated with the existing way of refilling the cooling water for cooling-down of the unit on Temelín nuclear power plant, in the long-term blackout. It analyzes operating conditions and identifies critical points of cooling water supply process at long-term power blackout, i.e. problems of critical safety function. Based on real data, the paper shows the risk management plan for re-sponse process to problems, using the feed and bleed method, for extreme accident scenario caused by long-term power blackout.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
21100 - Other engineering and technologies
Návaznosti výsledku
Projekt
—
Návaznosti
S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2022
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Understanding and Manageing Risk and Reliability for a Sustainable Future
ISBN
978-981-18-5183-4
ISSN
—
e-ISSN
—
Počet stran výsledku
8
Strana od-do
929-936
Název nakladatele
Singapore Management and Sports Science Institute, PTE, LTD
Místo vydání
Singapore
Místo konání akce
Dublin
Datum konání akce
28. 8. 2022
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—