Comparison of Small Modular Reactor and Large Nuclear Reactor Fuel Cost

Identifikátory výsledku

Alternativní jazyky

  • Jazyk výsledku

    angličtina

  • Název v původním jazyce

    Comparison of Small Modular Reactor and Large Nuclear Reactor Fuel Cost

  • Popis výsledku v původním jazyce

    Small modular reactors (SMRs) offer simple, standardized, and safe modular designs for new nuc- lear reactor construction. They are factory built, requiring smaller initial capital investment and facilitating shorter construction times. SMRs also promisecompetitive economy when compared with the current reactor fleet. Construction cost of a majority of the projects, which are mostly in their design stages, is not publicly available, but variable costs can be determined from fuel enrichment, average burn-up, and plant thermal efficiency, which are public parameters for many near-term SMR projects. The fuel cost of electricity generation for selected SMRs and large reac- tors is simulated, including calculation of optimal tails assay in the uranium enrichment process. The results are compared between one another and with current generation large reactor designs providing a rough comparison of the long-term economics of a new nuclear reactor project. SMRs are predicted to have higher fue

  • Název v anglickém jazyce

    Comparison of Small Modular Reactor and Large Nuclear Reactor Fuel Cost

  • Popis výsledku anglicky

    Small modular reactors (SMRs) offer simple, standardized, and safe modular designs for new nuc- lear reactor construction. They are factory built, requiring smaller initial capital investment and facilitating shorter construction times. SMRs also promisecompetitive economy when compared with the current reactor fleet. Construction cost of a majority of the projects, which are mostly in their design stages, is not publicly available, but variable costs can be determined from fuel enrichment, average burn-up, and plant thermal efficiency, which are public parameters for many near-term SMR projects. The fuel cost of electricity generation for selected SMRs and large reac- tors is simulated, including calculation of optimal tails assay in the uranium enrichment process. The results are compared between one another and with current generation large reactor designs providing a rough comparison of the long-term economics of a new nuclear reactor project. SMRs are predicted to have higher fue

Klasifikace

  • Druh

    Jx - Nezařazeno - Článek v odborném periodiku (Jimp, Jsc a Jost)

  • CEP obor

    JF - Jaderná energetika

  • OECD FORD obor

Návaznosti výsledku

Ostatní

  • Rok uplatnění

    2014

  • Kód důvěrnosti údajů

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Údaje specifické pro druh výsledku

  • Název periodika

    Energy and Power Engineering

  • ISSN

    1947-3818

  • e-ISSN

  • Svazek periodika

    6

  • Číslo periodika v rámci svazku

    5

  • Stát vydavatele periodika

    US - Spojené státy americké

  • Počet stran výsledku

    13

  • Strana od-do

    82-94

  • Kód UT WoS článku

  • EID výsledku v databázi Scopus

Základní informace

Druh výsledku

Jx - Nezařazeno - Článek v odborném periodiku (Jimp, Jsc a Jost)

Jx

CEP

JF - Jaderná energetika

Rok uplatnění

2014