Replacement of Ancillary Service Resources Lost during Decarbonization
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21220%2F22%3A00362874" target="_blank" >RIV/68407700:21220/22:00362874 - isvavai.cz</a>
Nalezeny alternativní kódy
RIV/68407700:21730/22:00362874
Výsledek na webu
<a href="https://doi.org/10.1109/ICUMT57764.2022.9943491" target="_blank" >https://doi.org/10.1109/ICUMT57764.2022.9943491</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1109/ICUMT57764.2022.9943491" target="_blank" >10.1109/ICUMT57764.2022.9943491</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Replacement of Ancillary Service Resources Lost during Decarbonization
Popis výsledku v původním jazyce
Decarbonization increases the need for ancillary services (AnS) but simultaneously decarbonization leads to the loss of power plants providing them. Renewable resources are not primarily designed to provide AnS. The separation of electricity generation from AnS provision is proposed and a concept of a hybrid power plant combining small generators and battery energy storage system (BESS) is introduced in this article. Technologies within such a power plant may be stopped and ready to start when AnS is currently not activated, which saves emissions. Delay in the start of turbines requires BESS support and represents a challenge for turbines scheduling and control/dispatch. The goal of this article is to describe uncertainties associated with the AnS provision and to propose suitable optimization methods and architecture of control algorithms.
Název v anglickém jazyce
Replacement of Ancillary Service Resources Lost during Decarbonization
Popis výsledku anglicky
Decarbonization increases the need for ancillary services (AnS) but simultaneously decarbonization leads to the loss of power plants providing them. Renewable resources are not primarily designed to provide AnS. The separation of electricity generation from AnS provision is proposed and a concept of a hybrid power plant combining small generators and battery energy storage system (BESS) is introduced in this article. Technologies within such a power plant may be stopped and ready to start when AnS is currently not activated, which saves emissions. Delay in the start of turbines requires BESS support and represents a challenge for turbines scheduling and control/dispatch. The goal of this article is to describe uncertainties associated with the AnS provision and to propose suitable optimization methods and architecture of control algorithms.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
20202 - Communication engineering and systems
Návaznosti výsledku
Projekt
<a href="/cs/project/TK04020051" target="_blank" >TK04020051: Algoritmy pro plánování provozu a operativní řízení decentrálního hybridního zdroje podpůrných služeb (Energy nest)</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2022
Kód důvěrnosti údajů
C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.
Údaje specifické pro druh výsledku
Název statě ve sborníku
2022 14th International Congress on Ultra Modern Telecommunications and Control Systems and Workshops (ICUMT)
ISBN
—
ISSN
2157-0221
e-ISSN
2157-023X
Počet stran výsledku
8
Strana od-do
145-152
Název nakladatele
IEEE Xplore
Místo vydání
—
Místo konání akce
Valencie
Datum konání akce
11. 10. 2022
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—