The Preparation for Solutions of Emergency Conditions in The Power Energy System
Popis výsledku v původním jazyce
Paper is covering basic characteristics concerning the importance and principles of defence and restoration planning in the Czech Republic. The task of this paper is to describe some preventions and solutions of emergency conditions in the power energy system in harmony with the restoration and defence plans of transmission systems. The island operation and the black-start unit capability of generation units during emergency situations in power systems are highlighted. Possible role of black-start capability of the pumped storage power station is discussed. The associated main technical and co-ordination problems, together with considering ancillary services are mentioned. The process and experience from classical start-up and island operation in the 400 kV level, with the help of pump-storage plan are presented.
Název v anglickém jazyce
The Preparation for Solutions of Emergency Conditions in The Power Energy System
Popis výsledku anglicky
Paper is covering basic characteristics concerning the importance and principles of defence and restoration planning in the Czech Republic. The task of this paper is to describe some preventions and solutions of emergency conditions in the power energy system in harmony with the restoration and defence plans of transmission systems. The island operation and the black-start unit capability of generation units during emergency situations in power systems are highlighted. Possible role of black-start capability of the pumped storage power station is discussed. The associated main technical and co-ordination problems, together with considering ancillary services are mentioned. The process and experience from classical start-up and island operation in the 400 kV level, with the help of pump-storage plan are presented.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
JE - Nejaderná energetika, spotřeba a užití energie
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
Z - Vyzkumny zamer (s odkazem do CEZ)
Ostatní
Rok uplatnění
2005
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Electric Power Engineering 2005
ISBN
80-248-0842-0
ISSN
—
e-ISSN
—
Počet stran výsledku
8
Strana od-do
1-8
Název nakladatele
VŠB-TUO
Místo vydání
Ostrava
Místo konání akce
Kouty nad Desnou
Datum konání akce
30. 5. 2005
Typ akce podle státní příslušnosti
EUR - Evropská akce
Kód UT WoS článku
—