Solving production scheduling with earliness/tardiness penalties by constraint programming
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21230%2F11%3A00161986" target="_blank" >RIV/68407700:21230/11:00161986 - isvavai.cz</a>
Výsledek na webu
<a href="http://dx.doi.org/10.1007/s10845-009-0318-2" target="_blank" >http://dx.doi.org/10.1007/s10845-009-0318-2</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1007/s10845-009-0318-2" target="_blank" >10.1007/s10845-009-0318-2</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Solving production scheduling with earliness/tardiness penalties by constraint programming
Popis výsledku v původním jazyce
This paper deals with an application of constraint programming in production scheduling with earliness and tardiness penalties that reflects the scheduling part of the Just-In-Time inventory strategy. Two scheduling problems are studied, an industrial case study problem of lacquer production scheduling, and also the job-shop scheduling problem with earliness/tardiness costs. The paper presents two algorithms that help the constraint programming solver to find solutions of these complex problems. The conducted experiments, using case study instances and randomly generated problem instances, show that our algorithms outperform generic approaches, and on average give better results than other nontrivial algorithms.
Název v anglickém jazyce
Solving production scheduling with earliness/tardiness penalties by constraint programming
Popis výsledku anglicky
This paper deals with an application of constraint programming in production scheduling with earliness and tardiness penalties that reflects the scheduling part of the Just-In-Time inventory strategy. Two scheduling problems are studied, an industrial case study problem of lacquer production scheduling, and also the job-shop scheduling problem with earliness/tardiness costs. The paper presents two algorithms that help the constraint programming solver to find solutions of these complex problems. The conducted experiments, using case study instances and randomly generated problem instances, show that our algorithms outperform generic approaches, and on average give better results than other nontrivial algorithms.
Klasifikace
Druh
J<sub>x</sub> - Nezařazeno - Článek v odborném periodiku (Jimp, Jsc a Jost)
CEP obor
BB - Aplikovaná statistika, operační výzkum
OECD FORD obor
—
Návaznosti výsledku
Projekt
Výsledek vznikl pri realizaci vícero projektů. Více informací v záložce Projekty.
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2011
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název periodika
Journal of Intelligent Manufacturing
ISSN
0956-5515
e-ISSN
—
Svazek periodika
22
Číslo periodika v rámci svazku
4
Stát vydavatele periodika
NL - Nizozemsko
Počet stran výsledku
10
Strana od-do
553-562
Kód UT WoS článku
000292889300007
EID výsledku v databázi Scopus
—