Production Scheduling with Alternative Process Plans
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21230%2F12%3A00182616" target="_blank" >RIV/68407700:21230/12:00182616 - isvavai.cz</a>
Výsledek na webu
<a href="http://80.www.sciencedirect.com.dialog.cvut.cz/science/article/pii/S0377221711008460" target="_blank" >http://80.www.sciencedirect.com.dialog.cvut.cz/science/article/pii/S0377221711008460</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1016/j.ejor.2011.09.018" target="_blank" >10.1016/j.ejor.2011.09.018</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Production Scheduling with Alternative Process Plans
Popis výsledku v původním jazyce
This paper deals with a scheduling problem with alternative process plans that was motivated by a production of wire harnesses where certain parts can be processed manually or automatically by different types of machines. Only a subset of all the given activities will form the solution, so the decision whether the activity will appear in the final schedule has to be made during the scheduling process. We extend classic RCPSP problem by a definition of alternative branchings, represented by the Petri nets formalism allowing one to define alternatives and parallelism within one data structure. For this representation of the problem, an integer linear programming model is formulated and the reduction of the problem, using time symmetry mapping, is shown.Finally, a heuristic algorithm based on priority schedule construction with an unscheduling step is proposed for the nested version of the problem and it is used to solve the case study of the wire harnesses production.
Název v anglickém jazyce
Production Scheduling with Alternative Process Plans
Popis výsledku anglicky
This paper deals with a scheduling problem with alternative process plans that was motivated by a production of wire harnesses where certain parts can be processed manually or automatically by different types of machines. Only a subset of all the given activities will form the solution, so the decision whether the activity will appear in the final schedule has to be made during the scheduling process. We extend classic RCPSP problem by a definition of alternative branchings, represented by the Petri nets formalism allowing one to define alternatives and parallelism within one data structure. For this representation of the problem, an integer linear programming model is formulated and the reduction of the problem, using time symmetry mapping, is shown.Finally, a heuristic algorithm based on priority schedule construction with an unscheduling step is proposed for the nested version of the problem and it is used to solve the case study of the wire harnesses production.
Klasifikace
Druh
J<sub>x</sub> - Nezařazeno - Článek v odborném periodiku (Jimp, Jsc a Jost)
CEP obor
JC - Počítačový hardware a software
OECD FORD obor
—
Návaznosti výsledku
Projekt
Výsledek vznikl pri realizaci vícero projektů. Více informací v záložce Projekty.
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)<br>Z - Vyzkumny zamer (s odkazem do CEZ)
Ostatní
Rok uplatnění
2012
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název periodika
European Journal of Operational Research
ISSN
0377-2217
e-ISSN
—
Svazek periodika
217
Číslo periodika v rámci svazku
2
Stát vydavatele periodika
NL - Nizozemsko
Počet stran výsledku
12
Strana od-do
300-311
Kód UT WoS článku
000297873700008