Vše

Co hledáte?

Vše
Projekty
Výsledky výzkumu
Subjekty

Rychlé hledání

  • Projekty podpořené TA ČR
  • Významné projekty
  • Projekty s nejvyšší státní podporou
  • Aktuálně běžící projekty

Chytré vyhledávání

  • Takto najdu konkrétní +slovo
  • Takto z výsledků -slovo zcela vynechám
  • “Takto můžu najít celou frázi”

International regulations - contribution of Czechoslovakia to electrical engineering standardization in Europe. The cooperation of Vladimír List and Ernest Mercier and its importance for the introduction of the MIR system in the 1960s in the countries of the Council for Mutual Economic Assistance.

Identifikátory výsledku

  • Kód výsledku v IS VaVaI

    <a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21230%2F16%3A00303526" target="_blank" >RIV/68407700:21230/16:00303526 - isvavai.cz</a>

  • Výsledek na webu

    <a href="https://www.peterlang.com/view/9782807600287/part03.xhtml" target="_blank" >https://www.peterlang.com/view/9782807600287/part03.xhtml</a>

  • DOI - Digital Object Identifier

    <a href="http://dx.doi.org/10.3726/978-3-0352-6605-4" target="_blank" >10.3726/978-3-0352-6605-4</a>

Alternativní jazyky

  • Jazyk výsledku

    francouzština

  • Název v původním jazyce

    La réglementation internationale – apport de la Tchécoslovaquie à la normalisation électrotechnique en Europe. La coopération de Vladimír List et Ernest Mercier et son importance pour l’introduction du système MIR dans les années 1960 dans les pays du Conseil d’assistance économique mutuelle.

  • Popis výsledku v původním jazyce

    En Tchécoslovaquie, l’électrification (Loi 438 de 1919) fut réalisée main dans la main avec la standardisation indispensable du secteur. Vladimír List et Ernest Mercier ont joué un rôle important dans la réalisation des deux actions. Le modèle de V. List et l’aide française ont permis dans les années 1919-1939 la création d’une excellente structure technique et économique d’électrification qui devient après la Seconde Guerre mondiale, la colonne vertébrale du réseau réuni pour les pays membres du Conseil d’assistance économique mutuelle (C.A.E.M.). Dans les années 1950, on commença à envisager dans le cadre du C.A.E.M. la connexion des systèmes énergétiques comme dans l’Union pour la coordination de la production et de la distribution de l’énergie électrique (U.C.P.T.E.) pour les pays occidentaux.

  • Název v anglickém jazyce

    International regulations - contribution of Czechoslovakia to electrical engineering standardization in Europe. The cooperation of Vladimír List and Ernest Mercier and its importance for the introduction of the MIR system in the 1960s in the countries of the Council for Mutual Economic Assistance.

  • Popis výsledku anglicky

    Electrification in Czechoslovakia (1919 Act No. 438) proceeded hand in hand with the inevitable standardization in this branch. A major role in interconnecting the two processes was played by Vladimír List and Ernest Mercier who often encountered at international meetings of electro technicians (for instance those held by the Société française d’électricité) and who actually shared similar opinions of the commercial and industrial activities in the electrical engineering sector, and primarily of electrification itself. Thanks to the French model and assistance, the period between 1919 and 1939 saw the emergence of a technologically and economically well-functioning electrification structure in Czechoslovakia, which later proved to be the backbone of an interconnected grid for the member countries of the Council for Mutual Economic Assistance also known as COMECON. Ideas envisioning interconnection of the energy systems also in the member states of the Council for Mutual Economic Assistance, similar to the system existing in the Western countries within the Union for the Coordination of Production and Transmission of Electricity (UCPTE), began to emerge in the 1950s. Such an interconnection between neighboring countries commenced in the years 1951–1953, namely between Slovakia and Hungary, to be followed by interlinking Bohemia, Poland and the German Democratic Republic (former East Germany). Parallel operation of the energy systems of Czechoslovakia, the German Democratic Republic, Hungary and Poland got under way in 1961. Austria also joined in and the Prague-based Central Dispatch Organization MIR was established in 1962. This system operated until the early 1990s.

Klasifikace

  • Druh

    C - Kapitola v odborné knize

  • CEP obor

    AB - Dějiny

  • OECD FORD obor

Návaznosti výsledku

  • Projekt

  • Návaznosti

    I - Institucionalni podpora na dlouhodoby koncepcni rozvoj vyzkumne organizace

Ostatní

  • Rok uplatnění

    2016

  • Kód důvěrnosti údajů

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

Údaje specifické pro druh výsledku

  • Název knihy nebo sborníku

    Electric Worlds / Mondes électriques Creations, Circulations, Tensions, Transitions (19th-21st C.)

  • ISBN

    9782807600287

  • Počet stran výsledku

    26

  • Strana od-do

    149-174

  • Počet stran knihy

    603

  • Název nakladatele

    P.I.E. - Peter Lang SA Éditions Scientifiques Internationales

  • Místo vydání

    Brussels

  • Kód UT WoS kapitoly