Time-Triggered Co-Scheduling of Computation and Communication with Jitter Requirements
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21230%2F16%3A00308848" target="_blank" >RIV/68407700:21230/16:00308848 - isvavai.cz</a>
Nalezeny alternativní kódy
RIV/68407700:21730/16:00308848
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Time-Triggered Co-Scheduling of Computation and Communication with Jitter Requirements
Popis výsledku v původním jazyce
The complexity of embedded application design is increasing with growing user demands. In particular, automotive embedded systems are highly complex in nature, and their functionality is realized by a set of periodic tasks. These tasks may have hard real-time requirements and communicate over an interconnection network. The problem is to efficiently co-schedule task execution on multiple cores and message transmission on the interconnection network so that all timing constraints are satisfied. Contemporary works typically deal with zero-jitter scheduling, which is less resource-efficient. Contrary, this article focuses on non-zero-jitter scheduling that puts constraints on the possible jitter of each task, increasing schedulability over zero-jitter scheduling.
Název v anglickém jazyce
Time-Triggered Co-Scheduling of Computation and Communication with Jitter Requirements
Popis výsledku anglicky
The complexity of embedded application design is increasing with growing user demands. In particular, automotive embedded systems are highly complex in nature, and their functionality is realized by a set of periodic tasks. These tasks may have hard real-time requirements and communicate over an interconnection network. The problem is to efficiently co-schedule task execution on multiple cores and message transmission on the interconnection network so that all timing constraints are satisfied. Contemporary works typically deal with zero-jitter scheduling, which is less resource-efficient. Contrary, this article focuses on non-zero-jitter scheduling that puts constraints on the possible jitter of each task, increasing schedulability over zero-jitter scheduling.
Klasifikace
Druh
O - Ostatní výsledky
CEP obor
JC - Počítačový hardware a software
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
N - Vyzkumna aktivita podporovana z neverejnych zdroju
Ostatní
Rok uplatnění
2016
Kód důvěrnosti údajů
C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.