Total Setup Time Minimisation in Production Scheduling with Alternatives
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21230%2F17%3A00317229" target="_blank" >RIV/68407700:21230/17:00317229 - isvavai.cz</a>
Nalezeny alternativní kódy
RIV/68407700:21730/17:00317229
Výsledek na webu
<a href="https://link.springer.com/chapter/10.1007/978-3-319-64635-0_2" target="_blank" >https://link.springer.com/chapter/10.1007/978-3-319-64635-0_2</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1007/978-3-319-64635-0_2" target="_blank" >10.1007/978-3-319-64635-0_2</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Total Setup Time Minimisation in Production Scheduling with Alternatives
Popis výsledku v původním jazyce
The research presented in this paper is focused on the scheduling problem with alternative process plans where the goal is to minimise the sum of all the performed setup times in the schedule. The setup times play an important role in scheduling problems, yet they are, in most cases, considered only as an additional constraint, not as a part of the objective function. We propose a model, based on the resource constrained project scheduling problem with alternative process plans, release times and deadlines, that includes the setup times in the scheduling criterion. Both the exact mathematical model and the new heuristic algorithm are proposed to solve the problem. The effectiveness of the proposed two-phase heuristic algorithm, designed with the intention to solve the large instances of the problem, is evaluated on a wide set of instances.
Název v anglickém jazyce
Total Setup Time Minimisation in Production Scheduling with Alternatives
Popis výsledku anglicky
The research presented in this paper is focused on the scheduling problem with alternative process plans where the goal is to minimise the sum of all the performed setup times in the schedule. The setup times play an important role in scheduling problems, yet they are, in most cases, considered only as an additional constraint, not as a part of the objective function. We propose a model, based on the resource constrained project scheduling problem with alternative process plans, release times and deadlines, that includes the setup times in the scheduling criterion. Both the exact mathematical model and the new heuristic algorithm are proposed to solve the problem. The effectiveness of the proposed two-phase heuristic algorithm, designed with the intention to solve the large instances of the problem, is evaluated on a wide set of instances.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
10201 - Computer sciences, information science, bioinformathics (hardware development to be 2.2, social aspect to be 5.8)
Návaznosti výsledku
Projekt
<a href="/cs/project/GA16-23509S" target="_blank" >GA16-23509S: Flexibilní rozvrhovací a optimalizační algoritmy pro distribuované systémy reálného času</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2017
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Industrial Applications of Holonic and Multi-Agent Systems
ISBN
978-3-319-64634-3
ISSN
0302-9743
e-ISSN
—
Počet stran výsledku
13
Strana od-do
11-23
Název nakladatele
Springer
Místo vydání
Cham
Místo konání akce
Lyon
Datum konání akce
28. 9. 2017
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—