Methodology of electricity supplying of critical infrastructure in crisis situations
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21230%2F20%3A00345600" target="_blank" >RIV/68407700:21230/20:00345600 - isvavai.cz</a>
Nalezeny alternativní kódy
RIV/68407700:21460/20:00345600
Výsledek na webu
<a href="https://doi.org/10.1109/EPE51172.2020.9269257" target="_blank" >https://doi.org/10.1109/EPE51172.2020.9269257</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1109/EPE51172.2020.9269257" target="_blank" >10.1109/EPE51172.2020.9269257</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Methodology of electricity supplying of critical infrastructure in crisis situations
Popis výsledku v původním jazyce
The paper focuses on the issues associated with the supply of electricity to critical infrastructure in crisis situations. In the introductory passages, the paper focuses on the methodology of selecting objects of critical infrastructure. Subsequently, attention is paid to selected aspects associated with the operation of electricity generation during a crisis situations. By using suitable types of production units (gas turbines), it is possible to gradually start island operation in the surrounding region, primarily for critical infrastructure facilities, whose main task is to protect the population. In the practical part, the paper focuses on the issues of stability of the island operation mode. The results of the case study show that for the switch-on plan it is necessary to take into account the dynamic characteristics of island operation by feeding the objects of critical infrastructure gradually after small electrical power steps.
Název v anglickém jazyce
Methodology of electricity supplying of critical infrastructure in crisis situations
Popis výsledku anglicky
The paper focuses on the issues associated with the supply of electricity to critical infrastructure in crisis situations. In the introductory passages, the paper focuses on the methodology of selecting objects of critical infrastructure. Subsequently, attention is paid to selected aspects associated with the operation of electricity generation during a crisis situations. By using suitable types of production units (gas turbines), it is possible to gradually start island operation in the surrounding region, primarily for critical infrastructure facilities, whose main task is to protect the population. In the practical part, the paper focuses on the issues of stability of the island operation mode. The results of the case study show that for the switch-on plan it is necessary to take into account the dynamic characteristics of island operation by feeding the objects of critical infrastructure gradually after small electrical power steps.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
20201 - Electrical and electronic engineering
Návaznosti výsledku
Projekt
<a href="/cs/project/VI20192022124" target="_blank" >VI20192022124: Zvýšení odolnosti regionu před hrozbou plošného výpadku el. energie s využitím nových technologií a postupů krizového řízení</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2020
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
2020 21st International Scientific Conference on Electric Power Engineering (EPE)
ISBN
978-1-7281-9479-0
ISSN
—
e-ISSN
—
Počet stran výsledku
5
Strana od-do
—
Název nakladatele
Czechoslovakia Section IEEE
Místo vydání
Prague
Místo konání akce
Prague
Datum konání akce
19. 10. 2020
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—