Risk Management Plan for Metro Station Safe Operation
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21260%2F17%3A00304118" target="_blank" >RIV/68407700:21260/17:00304118 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Risk Management Plan for Metro Station Safe Operation
Popis výsledku v původním jazyce
The metropolitan railway system like metro is very important structure of majority of capital traffic infrastructure. To ensure the safe metro operation, so its safety concept needs to have several layers. It goes minimally on: the construction of own entity and its equipment; ensuring the normal operation; and ensuring the operation at abnormal conditions. Due to both, a lack of knowledge, resources, forces and means, and the dynamic development of the world, it needs to be in accordance with the TQM project management type, processed the plan of management of important risks, especially those that relate to: the human factor (errors in decision-making and management); the failures of nature technical, technological and cyber; a lack of sources, forces and resources. The article includes the real results for the Praha capital metro station.
Název v anglickém jazyce
Risk Management Plan for Metro Station Safe Operation
Popis výsledku anglicky
The metropolitan railway system like metro is very important structure of majority of capital traffic infrastructure. To ensure the safe metro operation, so its safety concept needs to have several layers. It goes minimally on: the construction of own entity and its equipment; ensuring the normal operation; and ensuring the operation at abnormal conditions. Due to both, a lack of knowledge, resources, forces and means, and the dynamic development of the world, it needs to be in accordance with the TQM project management type, processed the plan of management of important risks, especially those that relate to: the human factor (errors in decision-making and management); the failures of nature technical, technological and cyber; a lack of sources, forces and resources. The article includes the real results for the Praha capital metro station.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
30305 - Occupational health
Návaznosti výsledku
Projekt
—
Návaznosti
S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2017
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Risk, Reliability and Safety: Innovating Theory and Practices
ISBN
978-1-315-37498-7
ISSN
—
e-ISSN
—
Počet stran výsledku
9
Strana od-do
1306-1314
Název nakladatele
Taylor & Francis
Místo vydání
London
Místo konání akce
Glasgow
Datum konání akce
25. 9. 2016
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
000414164700184