Construction of Wind Power Plants in the Czech Republic: How to Optimize the Approval Processes?
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21450%2F14%3A00227325" target="_blank" >RIV/68407700:21450/14:00227325 - isvavai.cz</a>
Výsledek na webu
<a href="http://landscapetransformations.eu/" target="_blank" >http://landscapetransformations.eu/</a>
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Construction of Wind Power Plants in the Czech Republic: How to Optimize the Approval Processes?
Popis výsledku v původním jazyce
This paper deals with the construction of wind power plants (WPPs) in the Czech Republic and focuses on the regulation of their construction. The regulation should ideally lead to the balancing the interests in protecting valuable landscape while ensuring real development potential of this technology. The paper analyses two basic institutes, which regulate the construction of WPPs in the Czech Republic. These are processes of Environmental Impact Assessment (EIA) and land-use planning processes at the municipal or regional level. It is found that roles of individual actors in approval processes are not clear. Construction of WPP is so conflicting activity that technical-rational methods of evaluation in EIA processes are not appropriate. Based on comparing regulation in neighboring Germany there are defined two basic strategies to ensure optimal regulation of wind power plants construction. The key decision should be in hand of regional authorities.
Název v anglickém jazyce
Construction of Wind Power Plants in the Czech Republic: How to Optimize the Approval Processes?
Popis výsledku anglicky
This paper deals with the construction of wind power plants (WPPs) in the Czech Republic and focuses on the regulation of their construction. The regulation should ideally lead to the balancing the interests in protecting valuable landscape while ensuring real development potential of this technology. The paper analyses two basic institutes, which regulate the construction of WPPs in the Czech Republic. These are processes of Environmental Impact Assessment (EIA) and land-use planning processes at the municipal or regional level. It is found that roles of individual actors in approval processes are not clear. Construction of WPP is so conflicting activity that technical-rational methods of evaluation in EIA processes are not appropriate. Based on comparing regulation in neighboring Germany there are defined two basic strategies to ensure optimal regulation of wind power plants construction. The key decision should be in hand of regional authorities.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
AP - Městské, oblastní a dopravní plánování
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2014
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Landscape Transformations 2014
ISBN
978-80-01-05676-9
ISSN
—
e-ISSN
—
Počet stran výsledku
7
Strana od-do
108-114
Název nakladatele
ČVUT, Fakulta architektury
Místo vydání
Praha
Místo konání akce
Praha
Datum konání akce
16. 10. 2014
Typ akce podle státní příslušnosti
EUR - Evropská akce
Kód UT WoS článku
—