Comparison of Load Combination Models for Probabilistic Calibrations
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21610%2F11%3A00183052" target="_blank" >RIV/68407700:21610/11:00183052 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Comparison of Load Combination Models for Probabilistic Calibrations
Popis výsledku v původním jazyce
Civil engineering structures are, as a rule, exposed to time-variant actions. Selection of an appropriate model for the load combination is one of the key issues of probabilistic calibrations. The submitted paper attempts to compare Turkstra's rule withanalyses based on Ferry Borges-Castanheta (FBC) models and rectangular wave renewal processes with intermittencies. Load combinations of two independent variable actions are numerically analysed for different load ratios and various types of loads. It appears that Turkstra's rule and the FBC processes provide sufficiently accurate results for a wide range of reliability problems while the analysis based on an upper bound on the failure probability for the intermittent renewal processes yields in some cases rather conservative estimates. For probabilistic calibrations application of Turkstra's rule is particularly convenient as reliability software products can be directly used and the partial factors can be readily der
Název v anglickém jazyce
Comparison of Load Combination Models for Probabilistic Calibrations
Popis výsledku anglicky
Civil engineering structures are, as a rule, exposed to time-variant actions. Selection of an appropriate model for the load combination is one of the key issues of probabilistic calibrations. The submitted paper attempts to compare Turkstra's rule withanalyses based on Ferry Borges-Castanheta (FBC) models and rectangular wave renewal processes with intermittencies. Load combinations of two independent variable actions are numerically analysed for different load ratios and various types of loads. It appears that Turkstra's rule and the FBC processes provide sufficiently accurate results for a wide range of reliability problems while the analysis based on an upper bound on the failure probability for the intermittent renewal processes yields in some cases rather conservative estimates. For probabilistic calibrations application of Turkstra's rule is particularly convenient as reliability software products can be directly used and the partial factors can be readily der
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
JN - Stavebnictví
OECD FORD obor
—
Návaznosti výsledku
Projekt
<a href="/cs/project/GA103%2F09%2F0693" target="_blank" >GA103/09/0693: Hodnocení bezpečnosti a rizik technických systémů</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2011
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Applications of Statistics and Probability in Civil Engineering
ISBN
978-0-415-66986-3
ISSN
—
e-ISSN
—
Počet stran výsledku
9
Strana od-do
977-985
Název nakladatele
Taylor & Francis Group
Místo vydání
Londýn
Místo konání akce
Zurich
Datum konání akce
1. 8. 2011
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—