UHPC Connection of Precast Bridge Deck
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21610%2F16%3A00303386" target="_blank" >RIV/68407700:21610/16:00303386 - isvavai.cz</a>
Nalezeny alternativní kódy
RIV/68407700:21110/16:00303386
Výsledek na webu
<a href="http://www.extension.iastate.edu/registration/events/UHPCPapers/UHPC_ID51.pdf" target="_blank" >http://www.extension.iastate.edu/registration/events/UHPCPapers/UHPC_ID51.pdf</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.21838/uhpc.2016.51" target="_blank" >10.21838/uhpc.2016.51</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
UHPC Connection of Precast Bridge Deck
Popis výsledku v původním jazyce
Ultra high performance concrete is very promising material for many construction applications. Its outstanding features are generally known [1][2]. UHPC should be used in complex structural details like joints of precast elements. Acceleration of bridge construction requires the development of new construction methods. In composite steel concrete bridges the cast in situ bridge deck may be replaced by a precast deck. For fast assembly the joints have to be solved adequately. UHPC joints represent an alternative which can satisfy the requirements on mechanical properties of joints, on construction and economy. The function of the joints and connections was experimentally verified using three different experiments. The performance of beams with precast slab with UHPC joint and cast in situ slab was compared.
Název v anglickém jazyce
UHPC Connection of Precast Bridge Deck
Popis výsledku anglicky
Ultra high performance concrete is very promising material for many construction applications. Its outstanding features are generally known [1][2]. UHPC should be used in complex structural details like joints of precast elements. Acceleration of bridge construction requires the development of new construction methods. In composite steel concrete bridges the cast in situ bridge deck may be replaced by a precast deck. For fast assembly the joints have to be solved adequately. UHPC joints represent an alternative which can satisfy the requirements on mechanical properties of joints, on construction and economy. The function of the joints and connections was experimentally verified using three different experiments. The performance of beams with precast slab with UHPC joint and cast in situ slab was compared.
Klasifikace
Druh
O - Ostatní výsledky
CEP obor
JN - Stavebnictví
OECD FORD obor
—
Návaznosti výsledku
Projekt
Výsledek vznikl pri realizaci vícero projektů. Více informací v záložce Projekty.
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2016
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů