DESIGN, INSTALLATION AND LONG TERM MONITORING OF UHPC FOOTBRIDGE OVER OPATOVICKY CHANNEL
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21610%2F17%3A00316112" target="_blank" >RIV/68407700:21610/17:00316112 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
DESIGN, INSTALLATION AND LONG TERM MONITORING OF UHPC FOOTBRIDGE OVER OPATOVICKY CHANNEL
Popis výsledku v původním jazyce
New prestressed footbridge made from ultra - high performance concrete (UHPC) was installed in Čeperka village across Opatovicky channel. A precast UHPC girder was casted in the premises of Skanska company. As a part of a footbridge design, UHPC handrail panels were also made from colored UHPC. Skanska and Pontex company with cooperation with Klokner institute developed matrix of UHPC used for footbridge construction. Material properties were verified during whole developing and producing process. During the girder casting a set of strain gauges were installed in order to obtain strains and deflections of the girder during storage, erection and operation of the footbridge’s girder. Actual contribution describes design, production and installation of footbridge. Main part of this paper is focused on results of long term monitoring of UHPC girder and also on visual monitoring of handrail. These measurements are very important in terms of long-term behaviour of the structure and also to gather experience about this favourable material.
Název v anglickém jazyce
DESIGN, INSTALLATION AND LONG TERM MONITORING OF UHPC FOOTBRIDGE OVER OPATOVICKY CHANNEL
Popis výsledku anglicky
New prestressed footbridge made from ultra - high performance concrete (UHPC) was installed in Čeperka village across Opatovicky channel. A precast UHPC girder was casted in the premises of Skanska company. As a part of a footbridge design, UHPC handrail panels were also made from colored UHPC. Skanska and Pontex company with cooperation with Klokner institute developed matrix of UHPC used for footbridge construction. Material properties were verified during whole developing and producing process. During the girder casting a set of strain gauges were installed in order to obtain strains and deflections of the girder during storage, erection and operation of the footbridge’s girder. Actual contribution describes design, production and installation of footbridge. Main part of this paper is focused on results of long term monitoring of UHPC girder and also on visual monitoring of handrail. These measurements are very important in terms of long-term behaviour of the structure and also to gather experience about this favourable material.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
20101 - Civil engineering
Návaznosti výsledku
Projekt
<a href="/cs/project/TH02020373" target="_blank" >TH02020373: Zvýšení životnosti a urychlení výstavby infrastrukturních dopravních staveb využitím moderního vysokohodnotného materiálu UHPC.</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2017
Kód důvěrnosti údajů
C - Předmět řešení projektu podléhá obchodnímu tajemství (§ 504 Občanského zákoníku), ale název projektu, cíle projektu a u ukončeného nebo zastaveného projektu zhodnocení výsledku řešení projektu (údaje P03, P04, P15, P19, P29, PN8) dodané do CEP, jsou upraveny tak, aby byly zveřejnitelné.
Údaje specifické pro druh výsledku
Název statě ve sborníku
UHPFRC 2017 Designing and Building with UHPFRC: New large-scale implementations, recent technical advances, experience and standards
ISBN
978-2-35158-166-7
ISSN
—
e-ISSN
—
Počet stran výsledku
10
Strana od-do
755-764
Název nakladatele
Rilem Publications s.a.r.l.
Místo vydání
Bagneux
Místo konání akce
Montpellier
Datum konání akce
2. 10. 2017
Typ akce podle státní příslušnosti
WRD - Celosvětová akce