Reliability Assessment of Industrial Chimneys Affected by Carbonation-Induced Corrosion; Decision-Making Based on Vol Analysis
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21610%2F17%3A00321117" target="_blank" >RIV/68407700:21610/17:00321117 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Reliability Assessment of Industrial Chimneys Affected by Carbonation-Induced Corrosion; Decision-Making Based on Vol Analysis
Popis výsledku v původním jazyce
This case study deals with the problems of existing reinforced concrete structures, which are at the end of their service life (usually designed for 40 years), and it is necessary to assess their reliability and decide on upgrade to extend their service life. An industrial chimney serves as an example where corrosion of the reinforcement caused by the carbonation of the concrete cover is a factor dominating reliability. All essential decision alternatives – repair, monitoring, no intervention – are compared using a value-of-conditional-information analysis – posterior analysis that evaluates whether monitoring costs are outweighed by the gain of new information. The result of the analysis should guide decision about reliability of other existing reinforced concrete structures.
Název v anglickém jazyce
Reliability Assessment of Industrial Chimneys Affected by Carbonation-Induced Corrosion; Decision-Making Based on Vol Analysis
Popis výsledku anglicky
This case study deals with the problems of existing reinforced concrete structures, which are at the end of their service life (usually designed for 40 years), and it is necessary to assess their reliability and decide on upgrade to extend their service life. An industrial chimney serves as an example where corrosion of the reinforcement caused by the carbonation of the concrete cover is a factor dominating reliability. All essential decision alternatives – repair, monitoring, no intervention – are compared using a value-of-conditional-information analysis – posterior analysis that evaluates whether monitoring costs are outweighed by the gain of new information. The result of the analysis should guide decision about reliability of other existing reinforced concrete structures.
Klasifikace
Druh
O - Ostatní výsledky
CEP obor
—
OECD FORD obor
20101 - Civil engineering
Návaznosti výsledku
Projekt
—
Návaznosti
S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2017
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů