Optimizing Monitoring - Implementation of Draft Guideline and Case Study of Roof Exposed to Snow Loads
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21610%2F18%3A00323977" target="_blank" >RIV/68407700:21610/18:00323977 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Optimizing Monitoring - Implementation of Draft Guideline and Case Study of Roof Exposed to Snow Loads
Popis výsledku v původním jazyce
This contribution addresses the optimisation of monitoring and decision-making criteria regarding the future use of structures and the related implementation in modern guidelines. A summary of the state-of-practice reveals deficiencies that are addressed by prospective guidance for the anticipated updates of standards, providing a general methodology to obtain cost-optimal decisions using limit state design, probabilistic reliability analysis and cost estimates. The implementation of a draft guideline and the corresponding risk-based approach are illustrated in a full-scale case study dealing with the roof of a stadium located in Northern Italy. The results demonstrate the potential of using monitoring systems and probabilistic reliability analysis in order to support decisions regarding safety measures such as snow removal, or temporary closure of the stadium.
Název v anglickém jazyce
Optimizing Monitoring - Implementation of Draft Guideline and Case Study of Roof Exposed to Snow Loads
Popis výsledku anglicky
This contribution addresses the optimisation of monitoring and decision-making criteria regarding the future use of structures and the related implementation in modern guidelines. A summary of the state-of-practice reveals deficiencies that are addressed by prospective guidance for the anticipated updates of standards, providing a general methodology to obtain cost-optimal decisions using limit state design, probabilistic reliability analysis and cost estimates. The implementation of a draft guideline and the corresponding risk-based approach are illustrated in a full-scale case study dealing with the roof of a stadium located in Northern Italy. The results demonstrate the potential of using monitoring systems and probabilistic reliability analysis in order to support decisions regarding safety measures such as snow removal, or temporary closure of the stadium.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
20101 - Civil engineering
Návaznosti výsledku
Projekt
Výsledek vznikl pri realizaci vícero projektů. Více informací v záložce Projekty.
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2018
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
IABSE SYMPOSIUM NANTES, 2018
ISBN
978-3-85748-161-1
ISSN
—
e-ISSN
—
Počet stran výsledku
8
Strana od-do
"S27-27"-"S27-34"
Název nakladatele
IABSE c/o ETH Hönggerberg
Místo vydání
Zürich
Místo konání akce
Nantes
Datum konání akce
19. 9. 2018
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—