Bridge Case Studies on the Assignment of Partial Safety Factors for the Assessment of Existing Structures
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21610%2F21%3A00351040" target="_blank" >RIV/68407700:21610/21:00351040 - isvavai.cz</a>
Výsledek na webu
<a href="http://dx.doi.org/10.1007/978-3-030-73616-3_15" target="_blank" >http://dx.doi.org/10.1007/978-3-030-73616-3_15</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1007/978-3-030-73616-3_15" target="_blank" >10.1007/978-3-030-73616-3_15</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Bridge Case Studies on the Assignment of Partial Safety Factors for the Assessment of Existing Structures
Popis výsledku v původním jazyce
Aging bridges in combination with an ever-growing traffic volume are a matter of concern all over the world. Consequently, the reassessment of existing bridges is gaining importance rapidly. This paper presents two bridge case studies considered within the IABSE Task Group 1.3 “Calibration of Partial Safety Factors for the Assessment of Existing Bridges”. The so-called design value method (DVM) and adjusted partial factor method (APFM), introduced in fib Bulletin 80 and both relying on a partial factor format, are considered in this paper. The objectives are (i) to illustrate how DVM and APFM can be used when specifying partial safety factors for the assessment of existing bridges, and (ii) to discuss some of the assumptions that are implied by these methods. Two case studies are considered for illustration in this paper: a single-span reinforced concrete slab and a 3-span continuous reinforced concrete slab.
Název v anglickém jazyce
Bridge Case Studies on the Assignment of Partial Safety Factors for the Assessment of Existing Structures
Popis výsledku anglicky
Aging bridges in combination with an ever-growing traffic volume are a matter of concern all over the world. Consequently, the reassessment of existing bridges is gaining importance rapidly. This paper presents two bridge case studies considered within the IABSE Task Group 1.3 “Calibration of Partial Safety Factors for the Assessment of Existing Bridges”. The so-called design value method (DVM) and adjusted partial factor method (APFM), introduced in fib Bulletin 80 and both relying on a partial factor format, are considered in this paper. The objectives are (i) to illustrate how DVM and APFM can be used when specifying partial safety factors for the assessment of existing bridges, and (ii) to discuss some of the assumptions that are implied by these methods. Two case studies are considered for illustration in this paper: a single-span reinforced concrete slab and a 3-span continuous reinforced concrete slab.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
20102 - Construction engineering, Municipal and structural engineering
Návaznosti výsledku
Projekt
<a href="/cs/project/GA20-01781S" target="_blank" >GA20-01781S: Modelování nejistot při hodnocení spolehlivosti betonových konstrukcí</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2021
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
18th International Probabilistic Workshop
ISBN
978-3-030-73615-6
ISSN
2366-2557
e-ISSN
—
Počet stran výsledku
14
Strana od-do
205-218
Název nakladatele
Springer
Místo vydání
Cham
Místo konání akce
Guimaraes
Datum konání akce
12. 5. 2021
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
001330679200015