Development of a Modular Retrofitting System for Residential Buildings and Experience from Pilot Installation
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21720%2F19%3A00332053" target="_blank" >RIV/68407700:21720/19:00332053 - isvavai.cz</a>
Výsledek na webu
<a href="https://iopscience.iop.org/article/10.1088/1755-1315/290/1/012132" target="_blank" >https://iopscience.iop.org/article/10.1088/1755-1315/290/1/012132</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1088/1755-1315/290/1/012132" target="_blank" >10.1088/1755-1315/290/1/012132</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Development of a Modular Retrofitting System for Residential Buildings and Experience from Pilot Installation
Popis výsledku v původním jazyce
In order to significantly reduce energy consumption of its building stock, Europe has to focus on energy retrofitting of existing buildings. A usual building retrofitting process is very labour intensive and time consuming. It usually takes several weeks or even months to replace old windows by new, install new thermal insulation layers on the external walls and roofs of buildings and renew the heat distribution systems or to attach renewable energy sources on the building's envelope. To make refurbishment more efficient and allow its scaling up, a European project Development and Advanced Prefabrication of Innovative, Multifunctional Building Envelope Elements for Modular Retrofitting and Connections (MORE-CONNECT) has been initiated under H2020 program. This project developed a system of prefabricated retrofitting modules, that enable to cut primary energy consumption of a typical residential building by 80 %, reduce on-site installation time bellow two weeks and improve the indoor environmental quality. At the same moment, the project aimed on implementation of systemic quality control over the whole design, pre-production, production and installation process in order to significantly reduce the number of warranty claims by the clients. The paper describes the design process of the modular retrofitting system and a pilot installation made on a mock-up building to test the concept, and presents the experience made.
Název v anglickém jazyce
Development of a Modular Retrofitting System for Residential Buildings and Experience from Pilot Installation
Popis výsledku anglicky
In order to significantly reduce energy consumption of its building stock, Europe has to focus on energy retrofitting of existing buildings. A usual building retrofitting process is very labour intensive and time consuming. It usually takes several weeks or even months to replace old windows by new, install new thermal insulation layers on the external walls and roofs of buildings and renew the heat distribution systems or to attach renewable energy sources on the building's envelope. To make refurbishment more efficient and allow its scaling up, a European project Development and Advanced Prefabrication of Innovative, Multifunctional Building Envelope Elements for Modular Retrofitting and Connections (MORE-CONNECT) has been initiated under H2020 program. This project developed a system of prefabricated retrofitting modules, that enable to cut primary energy consumption of a typical residential building by 80 %, reduce on-site installation time bellow two weeks and improve the indoor environmental quality. At the same moment, the project aimed on implementation of systemic quality control over the whole design, pre-production, production and installation process in order to significantly reduce the number of warranty claims by the clients. The paper describes the design process of the modular retrofitting system and a pilot installation made on a mock-up building to test the concept, and presents the experience made.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
20101 - Civil engineering
Návaznosti výsledku
Projekt
<a href="/cs/project/LO1605" target="_blank" >LO1605: Univerzitní centrum energeticky efektivních budov – Fáze udržitelnosti</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2019
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Central Europe towards Sustainable Building (CESB19)
ISBN
—
ISSN
1755-1307
e-ISSN
1755-1315
Počet stran výsledku
8
Strana od-do
—
Název nakladatele
IOP Publishing Ltd
Místo vydání
Bristol
Místo konání akce
Praha
Datum konání akce
2. 7. 2019
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—