Designing New Residential Building in Line with the Paris Agreement: a Case Study from Czechia
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F68407700%3A21720%2F19%3A00349509" target="_blank" >RIV/68407700:21720/19:00349509 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Designing New Residential Building in Line with the Paris Agreement: a Case Study from Czechia
Popis výsledku v původním jazyce
n order to reach the climate mitigation targets provided by the Paris Agreement, all industrial sectors need to massively reduce their GHG emissions. European building stock is responsible for one third of the GHG footprint and construction is one of the key sectors in the climate change mitigation. Objectives: The objective of the paper is to describe the impact of the climate-related targets transposed to the national level into design of new residential buildings. Methods: National target for residential buildings is set and a standard design of a residential building is compared towards it. Then improvements to the building are made in order that it gets inline with the target. Results: Several tweaks in building's construction and energy system was needed, but the target is achievable.
Název v anglickém jazyce
Designing New Residential Building in Line with the Paris Agreement: a Case Study from Czechia
Popis výsledku anglicky
n order to reach the climate mitigation targets provided by the Paris Agreement, all industrial sectors need to massively reduce their GHG emissions. European building stock is responsible for one third of the GHG footprint and construction is one of the key sectors in the climate change mitigation. Objectives: The objective of the paper is to describe the impact of the climate-related targets transposed to the national level into design of new residential buildings. Methods: National target for residential buildings is set and a standard design of a residential building is compared towards it. Then improvements to the building are made in order that it gets inline with the target. Results: Several tweaks in building's construction and energy system was needed, but the target is achievable.
Klasifikace
Druh
O - Ostatní výsledky
CEP obor
—
OECD FORD obor
20102 - Construction engineering, Municipal and structural engineering
Návaznosti výsledku
Projekt
<a href="/cs/project/LTT19022" target="_blank" >LTT19022: Česká účast v Annexu 72 Mezinárodní energetické agentury</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2019
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů