Konfirmační intervaly měřicích prostředků
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F70883521%3A28110%2F05%3A63503921" target="_blank" >RIV/70883521:28110/05:63503921 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Confirmative intervals of measuring means
Popis výsledku v původním jazyce
In engineering, as well as in other human scopes too, metrology en masse is a very important thing. This text will be focused only on measurement in common interpretation. Do not mean only measurement in itself; we must not miss out arrangements, connected with measurement. One of these arrangements is a designation of confirmative intervals of measuring means, whose syllabus is shown in the following text with illustration of simple example. Confirmative interval of measuring means is the period, during which measuring means will discharge a required function with defined accuracy and with predetermined probability. Every metrologist should follow this period, he should record it and he should see about another revision of situation of measuring meanswith impending end of this period. If introduced activities chain is not functional this way, it is possible, that such a plant will produce spoiled work. And that is why determination of confirmative intervals measuring means is a very
Název v anglickém jazyce
Confirmative intervals of measuring means
Popis výsledku anglicky
In engineering, as well as in other human scopes too, metrology en masse is a very important thing. This text will be focused only on measurement in common interpretation. Do not mean only measurement in itself; we must not miss out arrangements, connected with measurement. One of these arrangements is a designation of confirmative intervals of measuring means, whose syllabus is shown in the following text with illustration of simple example. Confirmative interval of measuring means is the period, during which measuring means will discharge a required function with defined accuracy and with predetermined probability. Every metrologist should follow this period, he should record it and he should see about another revision of situation of measuring meanswith impending end of this period. If introduced activities chain is not functional this way, it is possible, that such a plant will produce spoiled work. And that is why determination of confirmative intervals measuring means is a very
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
JS - Řízení spolehlivosti a kvality, zkušebnictví
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
Z - Vyzkumny zamer (s odkazem do CEZ)
Ostatní
Rok uplatnění
2005
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
MicroCAD 2005
ISBN
963-661-659-0
ISSN
—
e-ISSN
—
Počet stran výsledku
4
Strana od-do
139-143
Název nakladatele
University of Miskolc
Místo vydání
Miskolc
Místo konání akce
Miskolc
Datum konání akce
10. 3. 2005
Typ akce podle státní příslušnosti
EUR - Evropská akce
Kód UT WoS článku
—