The Simulation Case Study of the Complex Production System with Regeneration Plants
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F70883521%3A28140%2F13%3A43870856" target="_blank" >RIV/70883521:28140/13:43870856 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
The Simulation Case Study of the Complex Production System with Regeneration Plants
Popis výsledku v původním jazyce
The paper highlights the problem of mathematical modeling of the complex production system with interoperation buffer stores equipped with regeneration plants. Work stations are placed in a parallel way within serial production plants. The discussed logistic structure is controlled by means of decisions made in a deterministic way. The problem itself consists in determining the sequence of orders which are to be realized subsequently. The proposed heuristic algorithms choose an element of the required order on which certain operations are carried out in order to meet the stated criteria. The specification details and the model resulting from them led to creating the simulator which was employed to solve the problem of realizing orders. Equations illustrate the state of the system at each stage. The study case is based on predefined data and solved by means of the dedicated information tool created in the C# programming language.
Název v anglickém jazyce
The Simulation Case Study of the Complex Production System with Regeneration Plants
Popis výsledku anglicky
The paper highlights the problem of mathematical modeling of the complex production system with interoperation buffer stores equipped with regeneration plants. Work stations are placed in a parallel way within serial production plants. The discussed logistic structure is controlled by means of decisions made in a deterministic way. The problem itself consists in determining the sequence of orders which are to be realized subsequently. The proposed heuristic algorithms choose an element of the required order on which certain operations are carried out in order to meet the stated criteria. The specification details and the model resulting from them led to creating the simulator which was employed to solve the problem of realizing orders. Equations illustrate the state of the system at each stage. The study case is based on predefined data and solved by means of the dedicated information tool created in the C# programming language.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
JD - Využití počítačů, robotika a její aplikace
OECD FORD obor
—
Návaznosti výsledku
Projekt
<a href="/cs/project/ED2.1.00%2F03.0089" target="_blank" >ED2.1.00/03.0089: Centrum bezpečnostních, informačních a pokročilých technologií (CEBIA-Tech)</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2013
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Proceedings of the 14th WSEAS International Conference on Automation & Information (ICAI ?13)
ISBN
978-960-474-316-2
ISSN
1790-5117
e-ISSN
—
Počet stran výsledku
6
Strana od-do
85-90
Název nakladatele
WSEAS Press
Místo vydání
Montreux
Místo konání akce
Valencie
Datum konání akce
6. 8. 2013
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—