Building defects as a result of non-conceptual design
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F75081431%3A_____%2F19%3A00001836" target="_blank" >RIV/75081431:_____/19:00001836 - isvavai.cz</a>
Výsledek na webu
<a href="https://apps.webofknowledge.com/full_record.do?product=WOS&search_mode=GeneralSearch&qid=14&SID=F55hUJWfJTHPNS43AGM&page=1&doc=1" target="_blank" >https://apps.webofknowledge.com/full_record.do?product=WOS&search_mode=GeneralSearch&qid=14&SID=F55hUJWfJTHPNS43AGM&page=1&doc=1</a>
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Building defects as a result of non-conceptual design
Popis výsledku v původním jazyce
The contribution deals, describes and analyzes the fundamental connection between defects and the design of a building. Approximately half of the faults occur in building objects due to incorrect or faulty design activities. The non-conceptual approach to managing building preparation and insufficient and unqualified project design control poses problems with building use and increases the cost of maintenance. Improving engineering design and a comprehensive approach to project preparation and preparation is a way to increase the quality of design work. In his contribution, the author relies on quality management systems and their implementation in design offices and companies. At the same time, the term is a complex project, which would be a control tool for the quality of projection work.
Název v anglickém jazyce
Building defects as a result of non-conceptual design
Popis výsledku anglicky
The contribution deals, describes and analyzes the fundamental connection between defects and the design of a building. Approximately half of the faults occur in building objects due to incorrect or faulty design activities. The non-conceptual approach to managing building preparation and insufficient and unqualified project design control poses problems with building use and increases the cost of maintenance. Improving engineering design and a comprehensive approach to project preparation and preparation is a way to increase the quality of design work. In his contribution, the author relies on quality management systems and their implementation in design offices and companies. At the same time, the term is a complex project, which would be a control tool for the quality of projection work.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
—
OECD FORD obor
20100 - Civil engineering
Návaznosti výsledku
Projekt
—
Návaznosti
V - Vyzkumna aktivita podporovana z jinych verejnych zdroju
Ostatní
Rok uplatnění
2019
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
MATEC Web of Conferences, 279 (2019): 10th International Scientific Conference Building Defects (Building Defects 2018)
ISBN
—
ISSN
2261-236X
e-ISSN
—
Počet stran výsledku
11
Strana od-do
—
Název nakladatele
EDP Sciences
Místo vydání
Francie
Místo konání akce
30 11 2018
Datum konání akce
29. 11. 2018
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
000570802100007