Filtry
Out-of-pile testing channel for verification of heating rods
Successful testing and operation of pressurized testing channel for pressure and leakage testing of heating rods from various vendors....
JF - Jaderná energetika
- 2011 •
- Gprot
Rok uplatnění
Gprot - Prototyp
Test report Measurement of pile yarns
The protocol presents the results of the tensile test of a group of pile yarns on the cut-out of the 3D spacer fabric RZ335-155....
Materials engineering
- 2021 •
- O
Rok uplatnění
O - Ostatní výsledky
Verification of the feasibility and load carrying capacity of models of bored concrete piles
This paper explains load tests of models of bored concrete piles. In 2014 an experiment was carried out using testing equipment. The testing equipment was constructed the experiment was to test th...
JN - Stavebnictví
- 2015 •
- D •
- Odkaz
Rok uplatnění
D - Stať ve sborníku
Výsledek na webu
Influence of over Consolidation on the Piles Behavior below the Slabs in Deep Hole
A semi-analytical procedure is carried out to compute the settlement and normal force distribution of the axially load concrete bored pile. The value of the force depends on the geostatic stress state and on the quality of the soil ...
JJ - Ostatní materiály
- 2005 •
- D
Rok uplatnění
D - Stať ve sborníku
Influence of over Consolidation on the Piles Behavior below the Slabs in Deep Hole
A semi-analytical procedure is carried out to compute the settlement and normal force distribution of the axially load concrete bored pile. The value of the force depends on the geostatic stress state and on the quality of the soil ...
JJ - Ostatní materiály
- 2005 •
- A
Rok uplatnění
A - Audiovizuální tvorba
Methodology of monitoring gas emission exiting out of the tailings piles of coal-mines.
Practically tested methodical procedure while gas emission monitoring exiting out of tailings piles in context of elimination of old ecological burdens caused by mining activities....
DN - Vliv životního prostředí na zdraví
- 2008 •
- X
Rok uplatnění
X - Nezařazeno
THREE-DIMENSIONAL RESPONSE OF A PILE GROUP DUE TO TUNNEL ADVANCEMENT AT DIFFERENT C/D RATIOS
out to investigate settlement and load transfer mechanism of a pile group next to (Test T) and below the toe of the pile group (Test B). Moreover, numerical. On the contrary, the tunnelling below the ...
DB - Geologie a mineralogie
- 2016 •
- O
Rok uplatnění
O - Ostatní výsledky
Overview on Fusion Nuclear Technology Experimental Testing
and the LiPb eutectic alloy were examined in in-pile and out-pile tests, and the technology of the LiPb was developed. First wall mock-ups were in-pile and out-pile tested under...
Atomic, molecular and chemical physics (physics of atoms and molecules including collision, interaction with radiation, magnetic resonances, Mössbauer effect)
- 2016 •
- Jimp •
- Odkaz
Rok uplatnění
Jimp - Článek v periodiku v databázi Web of Science
Výsledek na webu
Overview on Fusion Nuclear Technology Experimental Testing
and the LiPb eutectic alloy were examined in in-pile and out-pile tests, and the technology of the LiPb was developed. First wall mock-ups were in-pile and out-pile tested under...
JF - Jaderná energetika
- 2016 •
- Jx •
- Odkaz
Rok uplatnění
Jx - Nezařazeno - Článek v odborném periodiku (Jimp, Jsc a Jost)
Výsledek na webu
Deliverable D42.41: Report on results from out-of-pile and in-pile experiments
and testing.
JF - Jaderná energetika
- 2014 •
- Vsouhrn •
- Odkaz
Rok uplatnění
Vsouhrn - Souhrnná výzkumná zpráva
Výsledek na webu
- 1 - 10 z 191 982