Filtry
From Chaos to Order Optimisation of Business Processes Execute by Software Robots (FW11020080)
The goal is to create a software module, called Scheduler, that will be able to respond to the uncertainties associated with the execution of these tasks. The main these automations. The project will: 1) create an automated generati...
Computer sciences, information science, bioinformathics (hardware development to be 2.2, social aspect to be 5.8)
- 2024 - 2027 •
- 18 407 tis. Kč •
- 14 020 tis. Kč •
- TA ČR
Řešení projektu: 1. 7. 2024 - 30. 6. 2027
Uznané náklady
Podpora ze státního rozpočtu (76%)
Poskytovatel: Technologická agentura ČR
Scheduling methods for heterogeneous distributed systems (GA201/07/1334)
The project proposal aims on scheduling in heterogeneous distributed systems, consisting of processors with different computational power interconnected by network was oriented on scheduling of applications described by directed acy...
IN - Informatika
- 2007 - 2009 •
- 805 tis. Kč •
- 805 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2007 - 31. 12. 2009
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Adaptive scheduling and Optimization algorithms for distributed Real-time Embeddes Systems (GAP103/12/1994)
A goal of this project is to obtain a better understanding of scheduling layer (e.g. choice of parameters/variants of applications) and local scheduling layer. We will concentrate on the development of (1) scheduling algori...
JC - Počítačový hardware a software
- 2012 - 2015 •
- 7 085 tis. Kč •
- 7 085 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2012 - 31. 12. 2015
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Energy-Aware Scheduling to Minimize Cost and Consumption of Manufacturing Main Panel P103-Cybernetics, artificial intelligence and information proces (GA25-17904S)
its costs by scheduling the production to hours with cheaper energy or by changing the processing speeds of machines. But the scheduling model of resources of tasks to robots, order of operations, choice of stationary p...
Computer sciences, information science, bioinformathics (hardware development to be 2.2, social aspect to be 5.8)
- 2025 - 2027 •
- 7 882 tis. Kč •
- 7 882 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2025 - 31. 12. 2027
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
SIMPLAN Optimal - Optimisation of production and distribution systems using simulation methods (GA101/98/0129)
/94/0547 "Software system for production planning and scheduling in SME using a simulation model". SIMPLAN - the system for production planning and scheduling using are able to do effective plans and schedules and they are ...
JD - Využití počítačů, robotika a její aplikace
- 1998 - 2000 •
- 685 tis. Kč •
- 685 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 1998 - 1. 1. 2000
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Different versions of N-back task comparing efficiency in improving fluid intelligence scores (GAP407/11/2130)
attention given to N-back task. Finally we propose a time schedule and discuss social...
AN - Psychologie
- 2011 - 2012 •
- 863 tis. Kč •
- 863 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2011 - 31. 12. 2012
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
KnowSched Knowledge Techniques in Scheduling (GAP202/10/1188)
Scheduling is studied for a long time and the research results include many solving algorithms for particular scheduling problems. There exists a classification of scheduling problems but no unified approach to describe par...
IN - Informatika
- 2010 - 2013 •
- 2 448 tis. Kč •
- 2 448 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2010 - 31. 12. 2013
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
The application software for advanced planning and scheduling manufacture (APS - Advanced Planning and Scheduling). (FF-P2/121)
Project targets are the following: to develop application software for advanced planning and scheduling manufacture and methodology and methods of integration into environment ERP systems.......
JD - Využití počítačů, robotika a její aplikace
- 2003 - 2005 •
- 15 105 tis. Kč •
- 6 749 tis. Kč •
- MPO
Řešení projektu: 1. 1. 2003 - 1. 1. 2005
Uznané náklady
Podpora ze státního rozpočtu (45%)
Poskytovatel: Ministerstvo průmyslu a obchodu
Discrete and Non-convex Optimization in Economy and Management (GA402/06/1071)
and managing practice, and have extraordinary importance in this area. Typical tasks problems and, in general, all tasks in which the economic model implies, e.g. optimization of service centers location, production scheduling<...
AH - Ekonomie
- 2006 - 2008 •
- 1 486 tis. Kč •
- 1 486 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2006 - 31. 12. 2008
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
Optimization Algorithms for the Project Scheduling Problem (GPP103/10/P401)
scheduling problem. The motivation is to find algorithms capable to solve larger production and project scheduling instances for real production processes. Current comfortable for human operators interacting with a scheduling
BB - Aplikovaná statistika, operační výzkum
- 2010 - 2011 •
- 870 tis. Kč •
- 870 tis. Kč •
- GA ČR
Řešení projektu: 1. 1. 2010 - 31. 12. 2011
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Grantová agentura České republiky
- 1 - 10 z 1 566