V458 - Construction of new high-voltage lines (A.0042)
The research report Ú12133 / 2016/002 includes results of corrosion tests of selected elements of steel construction towers at the power line V458 for action "V458 - construction of a new powere line"....
JK - Koroze a povrchové úpravy materiálu
- 2016 •
- Vsouhrn
Rok uplatnění
Vsouhrn - Souhrnná výzkumná zpráva
New technology for tunnel lining
The most commonly used construction material for the lining of underground reflected in the development of construction of underground structures. The article describes new trends in underground construction as pla...
JN - Stavebnictví
- 2011 •
- D
Rok uplatnění
D - Stať ve sborníku
Nodig Construction and Renovation underground Lines
Nodig Construction and Renovation underground Lines...
JM - Inženýrské stavitelství
- 2007 •
- B
Rok uplatnění
B - Odborná kniha
V458 - Construction of new high-voltage lines (A.0042) testing components of steel structures
The research report Ú12133 / 2016/002 includes tests of selected elements of steel construction towers at the power line V458 for action "V458 - construction of a new power line," including test protocols and final...
JK - Koroze a povrchové úpravy materiálu
- 2016 •
- Vsouhrn
Rok uplatnění
Vsouhrn - Souhrnná výzkumná zpráva
Work diagram of the shotcrete lining and lattice profiles
variation of the lining cross section during construction and shortly after completion, which is given by the construction process of the lining. The variable stiffness of the lining and rock ground durin...
JM - Inženýrské stavitelství
- 2012 •
- Jx
Rok uplatnění
Jx - Nezařazeno - Článek v odborném periodiku (Jimp, Jsc a Jost)
Construction of line skelets of surfaces and its using in cartography
Paper about construction of line skelets of surfaces and its using in cartography...
DE - Zemský magnetismus, geodesie, geografie
- 2003 •
- C
Rok uplatnění
C - Kapitola v odborné knize
Long-term development of the temperature in the lining of the tunnel Klimkovice
The final lining design of mined tunnels by using the NATM is connected with the need to ensure long-term durability of the construction. The interaction between the secondary lining and rock is ensured by contact with the ...
JM - Inženýrské stavitelství
- 2016 •
- D
Rok uplatnění
D - Stať ve sborníku
Deformation Characteristics of Shot Concrete Lining and Steel Lattice Beams
is determined by variable stiffness of the lining cross-section during the construction and solid rock mass during individual constructional stages of the lining determinedSteel-concrete tunnel lining is ...
JM - Inženýrské stavitelství
- 2012 •
- Jx •
- Odkaz
Rok uplatnění
Jx - Nezařazeno - Článek v odborném periodiku (Jimp, Jsc a Jost)
Výsledek na webu
The use of data obtained during the construction and operation of the tunnel for increasing the reliability of the tunnel liningThe use of data obtained during the construction and operation
and tunnel lining during geotechnical survey, construction and after commissioning of the tunnel to determine the behavior of the lining system - rock and identify the causes of any lining defects. For this, a mat...
Civil engineering
- 2023 •
- D
Rok uplatnění
D - Stať ve sborníku
Computer Aided Support of Construction of Tubular Line
The article deals with the possibilities of use of information technology in the construction of tubular line.