Filtry
Development of TOP ENTRY - KK8TE Ball valve (FV30058)
The aim is to develop a new type of pipe fitting, TOP-ENTRY-KK8TE ball valve. The output will be a fully functional prototype of the fitting. As a result and saddles. This solution improves the tightness and durability of the ball <...
Coating and films
- 2018 - 2020 •
- 13 685 tis. Kč •
- 9 782 tis. Kč •
- MPO
Řešení projektu: 1. 1. 2018 - 30. 6. 2020
Uznané náklady
Podpora ze státního rozpočtu (71%)
Poskytovatel: Ministerstvo průmyslu a obchodu
Components of steam turbines with increased resistance against creep and fatigue failure (TA04021166)
1. Using an optimal technology to manufacture welding joints of heavy components of steam turbines such as welded rotors and weldments of the cast parts valves, casings) with stem pipes of advanced creep resistant steels and alloys ...
JJ - Ostatní materiály
- 2014 - 2017 •
- 33 939 tis. Kč •
- 21 844 tis. Kč •
- TA ČR
Řešení projektu: 1. 7. 2014 - 31. 12. 2017
Uznané náklady
Podpora ze státního rozpočtu (64%)
Poskytovatel: Technologická agentura ČR
Pipeline flow of highly concentrated fine-grained slurries (IAA2060701)
,flow rate and concentration measurement in pipes of different diameters.The of polymers or surfactants and the effect of unsteady flow conditions (due to the valves and pump handling) on pressure variation in a pipe will b...
BK - Mechanika tekutin
- 1997 - 2001 •
- 5 021 tis. Kč •
- 1 780 tis. Kč •
- AV ČR
Řešení projektu: 1. 1. 1997 - 1. 1. 2001
Uznané náklady
Podpora ze státního rozpočtu (35%)
Poskytovatel: Akademie věd České republiky
Innovative research of check valves for extreme operating conditions in energetics (TH01011352)
characteristic of a check valve in case of flow reversal. -Measurement of water hammer at the check valve and velocity profile inside of the valve body using PIV technique. -Numerical simulation of the flow at the check
JQ - Strojní zařízení a nástroje
- 2015 - 2018 •
- 15 079 tis. Kč •
- 8 729 tis. Kč •
- TA ČR
Řešení projektu: 1. 1. 2015 - 31. 12. 2018
Uznané náklady
Podpora ze státního rozpočtu (58%)
Poskytovatel: Technologická agentura ČR
*Hydraulic proportional valves for mobile application. (FI-IM/215)
*Development and prototype verification of proportional pressure reducing and relief vaves as well as proportional directional valves. These valves are intended for applications in mobile machines, namely traktors, excavators, road ...
JQ - Strojní zařízení a nástroje
- 2004 - 2006 •
- 8 491 tis. Kč •
- 3 050 tis. Kč •
- MPO
Řešení projektu: 1. 1. 2004 - 1. 1. 2006
Uznané náklady
Podpora ze státního rozpočtu (36%)
Poskytovatel: Ministerstvo průmyslu a obchodu
Development of a new series of medium-pressure valves, their manufacturing technology and testing methodology, simulating 60 years of service life. (FV40115)
valves from molded blanks up to DN800 - develop their production technology life for new type of valve The project focuses on the development of medium-pressure gate valves designed for nuclear power plants. The novelty of...
Mechanical engineering
- 2019 - 2022 •
- 22 834 tis. Kč •
- 15 669 tis. Kč •
- MPO
Řešení projektu: 1. 1. 2019 - 30. 6. 2022
Uznané náklady
Podpora ze státního rozpočtu (69%)
Poskytovatel: Ministerstvo průmyslu a obchodu
Tissue engineering of an autologous pericardial heart valve replacement (NT11270)
Biological and mechanical valve replacements are presently connected biological aortic valve from human pericardium using tissue engineering. Pericardium and aortic valve will be obtained from a patient during cardiac surge...
FA - Kardiovaskulární nemoci včetně kardiochirurgie
- 2010 - 2013 •
- 9 052 tis. Kč •
- 9 035 tis. Kč •
- MZ
Řešení projektu: 1. 9. 2010 - 31. 12. 2013
Uznané náklady
Podpora ze státního rozpočtu (100%)
Poskytovatel: Ministerstvo zdravotnictví
*Ecological Machinable Brasses with reduced Heavy Low-melting Metals Content (FI-IM5/178)
, e.g. valves, water meters, various pipe unions and nuts, and many other parts...
JG - Hutnictví, kovové materiály
- 2008 - 2010 •
- 12 901 tis. Kč •
- 6 000 tis. Kč •
- MPO
Řešení projektu: 14. 3. 2008 - 31. 12. 2010
Uznané náklady
Podpora ze státního rozpočtu (47%)
Poskytovatel: Ministerstvo průmyslu a obchodu
Development of new series of cryogenic ball valves, their manufacturing technology and testing (FV10717)
The point of the project ' Development of new series of cryogenic ball valves ball valves 2. To propose production technology with an emphasis on design of production technology and following evaluation of utility attributes of bal...
JR - Ostatní strojírenství
- 2016 - 2018 •
- 21 450 tis. Kč •
- 14 437 tis. Kč •
- MPO
Řešení projektu: 1. 2. 2016 - 31. 12. 2018
Uznané náklady
Podpora ze státního rozpočtu (67%)
Poskytovatel: Ministerstvo průmyslu a obchodu
Pipe joints and flanges insulation development (EG15_018/0004586)
Pipe joints and flanges insulation development...
JJ - Ostatní materiály
- 2015 - 2020 •
- 12 228 tis. Kč •
- 1 401 tis. Kč •
- MPO
Řešení projektu: 26. 9. 2015 - 25. 5. 2020
Uznané náklady
Podpora ze státního rozpočtu (11%)
Poskytovatel: Ministerstvo průmyslu a obchodu
- 1 - 10 z 216