All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”

The development and manufacture of a prototype of remonte - controlled hydraulic robot that makes possible work into the pipe of the dimension under 200 mm.

Public support

  • Provider

    Ministry of Industry and Trade

  • Programme

    ADVANCEMENT (National programme of research)

  • Call for proposals

    POKROK 2 (SMPO200530007)

  • Main participants

  • Contest type

    VS - Public tender

  • Contract ID

    1H-PK2/50

Alternative language

  • Project name in Czech

    Vývoj a výroba prototypu dálkově ovládaného hydraulického robota umožňujícího práci v trubních vedeních o velkých DN menších než 200 mm.

  • Annotation in Czech

    Cílem projektu je pod obchodním názvem KAWO Robot vyvinout, vyrobit funkční prototyp a uvést na trh dálkově ovládaného hydraulického robota umožňujícího práci v trubních vedeních o DN menších než 200 mm.

Scientific branches

  • R&D category

    VV - Exeperimental development

  • CEP classification - main branch

    JP - Industrial processes and processing

  • CEP - secondary branch

    JM - Structural engineering

  • CEP - another secondary branch

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20102 - Construction engineering, Municipal and structural engineering<br>20501 - Materials engineering<br>20705 - Remote sensing<br>20706 - Marine engineering, sea vessels<br>20707 - Ocean engineering

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    The goals and material contents of the project under subject were fulfilled within the defined extent and terms.

Solution timeline

  • Realization period - beginning

    May 10, 2005

  • Realization period - end

    Jun 30, 2008

  • Project status

    U - Finished project

  • Latest support payment

    May 29, 2008

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP09-MPO-1H-U/02:2

  • Data delivery date

    Apr 14, 2010

Finance

  • Total approved costs

    9,721 thou. CZK

  • Public financial support

    3,678 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    6,044 thou. CZK