All

What are you looking for?

All
Projects
Results
Organizations

Quick search

  • Projects supported by TA ČR
  • Excellent projects
  • Projects with the highest public support
  • Current projects

Smart search

  • That is how I find a specific +word
  • That is how I leave the -word out of the results
  • “That is how I can find the whole phrase”
7G11033

MATerials TEsting and Rules

Public support

  • Provider

    Ministry of Education, Youth and Sports

  • Programme

  • Call for proposals

  • Main participants

  • Contest type

    RP - Co-financing of EC programme

  • Contract ID

    MSMT-1839/2013-310

Alternative language

  • Project name in Czech

    MATerials TEsting and Rules

  • Annotation in Czech

    The 2010-2012 implementation plan of the European Sustainable Nuclear Industrial Initiative (ESNII), in the frame of the Sustainable Nuclear Energy Technology Platform (SNE TP), establishes a very tight time schedule for the start of construction of theEuropean Gen IV prototypes; namely the construction of the LFR ETPP (European Technology Pilot Plant) Myrrha will start in 2014 and that of the SFR Prototype ASTRID will start in 2017. The GEN IV reactors pose new challenges to the designers and scientists in terms of higher operating temperature and higher irradiation damage of materials with respect to the present technologies. In this frame, the MATTER (MATerials TEsting and Rules) Project intends to start well targeted researches to perform carefulstudies of materials behaviors in GEN IV operational conditions and to find out criteria for the correct use of these materials in relevant reactor applications. Aim of the present Project is to complement the materials researches, in the frame of the EERA guidelines, with the implementation of pre-normative rules. The Project comprehends: - Mature materials research focused on testing procedures for the new reactors conditions - Supporting experiments of mature materials aimed to liquid metals characterization and to pre-normative qualification, - Pre-normative activities, comprehensive of experiments, to revise and update the design rules, - Preparation and starting of the EERA Joint Program by harmonization of the structure and finalization of the preliminary program in accordance with the deployment strategy of the SNETP. A relevant advantage of this approach consists in the possibility to achieve a correct aiming for the expensive materials testing operations. Other advantages are the comparability of the experimental data, being produced by consensual procedures, and the immediate availability of the experimental results (at least for some properties) in view of their pre-normative deployment.

Scientific branches

  • R&D category

    AP - Applied research

  • CEP classification - main branch

    JF - Nuclear energy

  • CEP - secondary branch

    JG - Metallurgy, metal materials

  • CEP - another secondary branch

    JJ - Other materials

  • OECD FORD - equivalent branches <br>(according to the <a href="http://www.vyzkum.cz/storage/att/E6EF7938F0E854BAE520AC119FB22E8D/Prevodnik_oboru_Frascati.pdf">converter</a>)

    20305 - Nuclear related engineering; (nuclear physics to be 1.3);<br>20501 - Materials engineering<br>20502 - Paper and wood<br>20503 - Textiles; including synthetic dyes, colours, fibres (nanoscale materials to be 2.10; biomaterials to be 2.9)<br>21001 - Nano-materials (production and properties)<br>21002 - Nano-processes (applications on nano-scale); (biomaterials to be 2.9)

Completed project evaluation

  • Provider evaluation

    U - Uspěl podle zadání (s publikovanými či patentovanými výsledky atd.)

  • Project results evaluation

    Following the condition that the candidate of financial contribution was evaluated and afterwards selected by international provider in accordance with the rules of the program the Ministry of Education, Youth ans Sports does not realize the evaluation of project results. The project is evaluated only after its approval by an international provider.

Solution timeline

  • Realization period - beginning

    Jan 1, 2011

  • Realization period - end

    Dec 31, 2014

  • Project status

    U - Finished project

  • Latest support payment

    Mar 20, 2014

Data delivery to CEP

  • Confidentiality

    S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů

  • Data delivery code

    CEP15-MSM-7G-U/01:1

  • Data delivery date

    Jul 2, 2015

Finance

  • Total approved costs

    8,564 thou. CZK

  • Public financial support

    8,564 thou. CZK

  • Other public sources

    0 thou. CZK

  • Non public and foreign sources

    0 thou. CZK