Optimal design of production system under limited budget
The result's identifiers
Result code in IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F60460709%3A41110%2F19%3A81039" target="_blank" >RIV/60460709:41110/19:81039 - isvavai.cz</a>
Result on the web
—
DOI - Digital Object Identifier
—
Alternative languages
Result language
angličtina
Original language name
Optimal design of production system under limited budget
Original language description
In this paper we continue our previous research focused on multiple criteria optimization of system design. First we briefly recall Zeleny basic model and two solution methods of so called de novo programming problems, namely, original Zeleny approach and later modification proposed by Shi. Then we point out to some possible extensions and applications and present examples showing features that were not observed previously. We conclude with pointing to an interesting connection to the Nash model of cooperative bargaining.
Czech name
—
Czech description
—
Classification
Type
D - Article in proceedings
CEP classification
—
OECD FORD branch
10102 - Applied mathematics
Result continuities
Project
—
Continuities
S - Specificky vyzkum na vysokych skolach
Others
Publication year
2019
Confidentiality
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Data specific for result type
Article name in the collection
Proceedings of the 22nd Czech-Japan Seminar on Data Analysisand Decision Making (CJS’19)
ISBN
978-80-7378-401-0
ISSN
—
e-ISSN
—
Number of pages
12
Pages from-to
215-226
Publisher name
MatfyzPress
Place of publication
Praha
Event location
Světlov
Event date
Sep 25, 2019
Type of event by nationality
WRD - Celosvětová akce
UT code for WoS article
—