The Archducal Brewery Foundation and the Beginnings of City Electrification in Benešov
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216208%3A11210%2F14%3A10315440" target="_blank" >RIV/00216208:11210/14:10315440 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
The Archducal Brewery Foundation and the Beginnings of City Electrification in Benešov
Popis výsledku v původním jazyce
The new modern building of the archducal brewery in Benešov from the years 1896-1897, was already equipped to use electricity with an installed own small power plant. The paper provides answers to questions about the role played introduction electricityfor brewing and how the electric current was used in breweries specifically. Equally important, however, was the installation of electrical outlets in the brewery for the beginnings of electrification of the city. Connection of several public buildings on his grid was at the beginning of its successful implementation. Context of this step and the later development of electrification of the city before First World War observes the second half of this paper, ending connecting the city network developed within the systematic electrification by Elektrárenský svaz středočeských okresů.
Název v anglickém jazyce
The Archducal Brewery Foundation and the Beginnings of City Electrification in Benešov
Popis výsledku anglicky
The new modern building of the archducal brewery in Benešov from the years 1896-1897, was already equipped to use electricity with an installed own small power plant. The paper provides answers to questions about the role played introduction electricityfor brewing and how the electric current was used in breweries specifically. Equally important, however, was the installation of electrical outlets in the brewery for the beginnings of electrification of the city. Connection of several public buildings on his grid was at the beginning of its successful implementation. Context of this step and the later development of electrification of the city before First World War observes the second half of this paper, ending connecting the city network developed within the systematic electrification by Elektrárenský svaz středočeských okresů.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
AB - Dějiny
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2014
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
POSTER 2014 - 18th International Student Conference on Electrical Engineering
ISBN
978-80-01-05499-4
ISSN
—
e-ISSN
—
Počet stran výsledku
4
Strana od-do
—
Název nakladatele
ČVUT Praha
Místo vydání
Praha
Místo konání akce
ČVUT,Technická 6, 166 27 Praha 6
Datum konání akce
15. 5. 2014
Typ akce podle státní příslušnosti
WRD - Celosvětová akce
Kód UT WoS článku
—