Confidence intervals for point-of-stabilization of content uniformity
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216208%3A11320%2F22%3A10448839" target="_blank" >RIV/00216208:11320/22:10448839 - isvavai.cz</a>
Výsledek na webu
<a href="https://verso.is.cuni.cz/pub/verso.fpl?fname=obd_publikace_handle&handle=ZR~6vsgBd7" target="_blank" >https://verso.is.cuni.cz/pub/verso.fpl?fname=obd_publikace_handle&handle=ZR~6vsgBd7</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1002/pst.2207" target="_blank" >10.1002/pst.2207</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Confidence intervals for point-of-stabilization of content uniformity
Popis výsledku v původním jazyce
Within the framework of continuous pharmaceutical manufacturing, we are interested in statistical modeling of the initial behavior of the production line. Assuming a gradually changing sequence of a suitable product quality characteristic (e.g., the content uniformity), we estimate the so-called point-of-stabilization (PoSt) and construct corresponding confidence regions based on appropriate asymptotic distributions and bootstrap. We investigate linear, quadratic, and nonlinear gradual change models both in homoscedastic and heteroscedastic setup. We propose a new nonlinear E-max gradual change model and show that it is applicable even if the true model is linear. Asymptotic distribution of the PoSt estimator is known only in a homoscedastic linear and quadratic model and, therefore, bootstrap approximations are used to construct one-sided PoSt confidence intervals.
Název v anglickém jazyce
Confidence intervals for point-of-stabilization of content uniformity
Popis výsledku anglicky
Within the framework of continuous pharmaceutical manufacturing, we are interested in statistical modeling of the initial behavior of the production line. Assuming a gradually changing sequence of a suitable product quality characteristic (e.g., the content uniformity), we estimate the so-called point-of-stabilization (PoSt) and construct corresponding confidence regions based on appropriate asymptotic distributions and bootstrap. We investigate linear, quadratic, and nonlinear gradual change models both in homoscedastic and heteroscedastic setup. We propose a new nonlinear E-max gradual change model and show that it is applicable even if the true model is linear. Asymptotic distribution of the PoSt estimator is known only in a homoscedastic linear and quadratic model and, therefore, bootstrap approximations are used to construct one-sided PoSt confidence intervals.
Klasifikace
Druh
J<sub>imp</sub> - Článek v periodiku v databázi Web of Science
CEP obor
—
OECD FORD obor
10103 - Statistics and probability
Návaznosti výsledku
Projekt
<a href="/cs/project/GF22-01639K" target="_blank" >GF22-01639K: Postupné funkcionální změny - GraFuCha</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2022
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název periodika
Pharmaceutical Statistics
ISSN
1539-1604
e-ISSN
1539-1612
Svazek periodika
21
Číslo periodika v rámci svazku
5
Stát vydavatele periodika
GB - Spojené království Velké Británie a Severního Irska
Počet stran výsledku
16
Strana od-do
944-959
Kód UT WoS článku
000773669400001
EID výsledku v databázi Scopus
2-s2.0-85127341594