Power Network Reliability Computations Using Multi-Agent Simulation
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216224%3A14330%2F12%3A00067072" target="_blank" >RIV/00216224:14330/12:00067072 - isvavai.cz</a>
Výsledek na webu
<a href="http://dx.doi.org/10.1007/978-3-642-34645-3_3" target="_blank" >http://dx.doi.org/10.1007/978-3-642-34645-3_3</a>
DOI - Digital Object Identifier
<a href="http://dx.doi.org/10.1007/978-3-642-34645-3_3" target="_blank" >10.1007/978-3-642-34645-3_3</a>
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Power Network Reliability Computations Using Multi-Agent Simulation
Popis výsledku v původním jazyce
The reliability of a power network as a whole is limited by the reliability of the weakest element in the network. Ensuring the reliability just with nothing more than a readiness to repair or replace broken parts is not feasible economically, and planned element replacements in the middle of their working life is often a waste of working resources. This article presents a multi-agent simulation system designed for modelling all aspects of power network elements and power network processes. The modelling of this system is able to predict the weak points of a simulated power network over an extended time span (decades). This mode of prediction takes into account the network topology, which means that each element is modelled in a context that is close to the real one. To show the system capabilities, we present two models of computations based on real power networks of 10 kV.
Název v anglickém jazyce
Power Network Reliability Computations Using Multi-Agent Simulation
Popis výsledku anglicky
The reliability of a power network as a whole is limited by the reliability of the weakest element in the network. Ensuring the reliability just with nothing more than a readiness to repair or replace broken parts is not feasible economically, and planned element replacements in the middle of their working life is often a waste of working resources. This article presents a multi-agent simulation system designed for modelling all aspects of power network elements and power network processes. The modelling of this system is able to predict the weak points of a simulated power network over an extended time span (decades). This mode of prediction takes into account the network topology, which means that each element is modelled in a context that is close to the real one. To show the system capabilities, we present two models of computations based on real power networks of 10 kV.
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
IN - Informatika
OECD FORD obor
—
Návaznosti výsledku
Projekt
<a href="/cs/project/GA102%2F09%2F1842" target="_blank" >GA102/09/1842: Spolehlivá elektroenergetická soustava s připojenými netradičními zdroji</a><br>
Návaznosti
P - Projekt vyzkumu a vyvoje financovany z verejnych zdroju (s odkazem do CEP)
Ostatní
Rok uplatnění
2012
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Transactions on Computational Collective Intelligence
ISBN
9783642346446
ISSN
0302-9743
e-ISSN
—
Počet stran výsledku
19
Strana od-do
63-81
Název nakladatele
Springer-Verlag
Místo vydání
Berlin
Místo konání akce
Berlin
Datum konání akce
1. 1. 2012
Typ akce podle státní příslušnosti
CST - Celostátní akce
Kód UT WoS článku
—