Footbridge across the Svratka river in Brno, Czech Republic
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26110%2F11%3APU92728" target="_blank" >RIV/00216305:26110/11:PU92728 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Footbridge across the Svratka river in Brno, Czech Republic
Popis výsledku v původním jazyce
The bridge connects a newly developed area (Spielberk Office Centre) with an old city center. It is situated in the vicinity of a new international hotel and a prestige office area. Close to the bridge an old multi span arch bridge with piers in the river is situated. It was evident that a new bridge should also be formed by an arch structure, however, with a bold span without piers in the river bed. Due to poor geotechnical conditions a traditional arch structure that requires resisting of a large horizontal force would be too expensive. Therefore a self anchored stress ribbon & arch structure has been accepted. Smooth curves that are characteristic for stress ribbon structures allowed a soft connection of the bridge deck with both banks.
Název v anglickém jazyce
Footbridge across the Svratka river in Brno, Czech Republic
Popis výsledku anglicky
The bridge connects a newly developed area (Spielberk Office Centre) with an old city center. It is situated in the vicinity of a new international hotel and a prestige office area. Close to the bridge an old multi span arch bridge with piers in the river is situated. It was evident that a new bridge should also be formed by an arch structure, however, with a bold span without piers in the river bed. Due to poor geotechnical conditions a traditional arch structure that requires resisting of a large horizontal force would be too expensive. Therefore a self anchored stress ribbon & arch structure has been accepted. Smooth curves that are characteristic for stress ribbon structures allowed a soft connection of the bridge deck with both banks.
Klasifikace
Druh
J<sub>x</sub> - Nezařazeno - Článek v odborném periodiku (Jimp, Jsc a Jost)
CEP obor
JM - Inženýrské stavitelství
OECD FORD obor
—
Návaznosti výsledku
Projekt
<a href="/cs/project/FI-IM5%2F128" target="_blank" >FI-IM5/128: Progresivní konstrukce z vysokohodnotného betonu</a><br>
Návaznosti
Z - Vyzkumny zamer (s odkazem do CEZ)
Ostatní
Rok uplatnění
2011
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název periodika
Structural Concrete
ISSN
1464-4177
e-ISSN
—
Svazek periodika
12
Číslo periodika v rámci svazku
2
Stát vydavatele periodika
GB - Spojené království Velké Británie a Severního Irska
Počet stran výsledku
6
Strana od-do
76-81
Kód UT WoS článku
—
EID výsledku v databázi Scopus
—