Lot Streaming in Job Shop Scheduling
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26210%2F01%3APU20835" target="_blank" >RIV/00216305:26210/01:PU20835 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
Lot Streaming in Job Shop Scheduling
Popis výsledku v původním jazyce
Lot streaming is a process of splitting production lots (batches) into smaller transfer lots (sublots, transfer batches) and moving these sublots to the next processing stage so that operations at successive stages can be overlapped. In this paper the following assumptions are considered: Each job (production lot) is divided into equal-sized transfer lots a number of which is the same for all operations. Once a machine is set-up for a job, it cannot be used to process any other job until the processingof all transfer lots is finished. Under these assumptions it is not necessary to model the movement of individual transfer lots. Their start times are derivable from start and completion times of job operation, which can be obtained by means of approach,based on a disjunctive graph model and a modification of the Critical Path Method. It is possible to integrate this approach into any heuristic method for job shop scheduling which uses the disjunctive graph-based representation and the
Název v anglickém jazyce
Lot Streaming in Job Shop Scheduling
Popis výsledku anglicky
Lot streaming is a process of splitting production lots (batches) into smaller transfer lots (sublots, transfer batches) and moving these sublots to the next processing stage so that operations at successive stages can be overlapped. In this paper the following assumptions are considered: Each job (production lot) is divided into equal-sized transfer lots a number of which is the same for all operations. Once a machine is set-up for a job, it cannot be used to process any other job until the processingof all transfer lots is finished. Under these assumptions it is not necessary to model the movement of individual transfer lots. Their start times are derivable from start and completion times of job operation, which can be obtained by means of approach,based on a disjunctive graph model and a modification of the Critical Path Method. It is possible to integrate this approach into any heuristic method for job shop scheduling which uses the disjunctive graph-based representation and the
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
BB - Aplikovaná statistika, operační výzkum
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
Z - Vyzkumny zamer (s odkazem do CEZ)
Ostatní
Rok uplatnění
2001
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Proceedings of the XXVI. Seminar ASR?2001 Instruments and Control. VŠB - TU Ostrava
ISBN
80-7078-890-9
ISSN
—
e-ISSN
—
Počet stran výsledku
6
Strana od-do
—
Název nakladatele
VŠB - TU Ostrava
Místo vydání
Ostrava
Místo konání akce
Ostrava
Datum konání akce
26. 4. 2001
Typ akce podle státní příslušnosti
CST - Celostátní akce
Kód UT WoS článku
—