SAFETY FACTORS IN EFFORT ESTIMATION
Identifikátory výsledku
Kód výsledku v IS VaVaI
<a href="https://www.isvavai.cz/riv?ss=detail&h=RIV%2F00216305%3A26230%2F10%3APU91980" target="_blank" >RIV/00216305:26230/10:PU91980 - isvavai.cz</a>
Výsledek na webu
—
DOI - Digital Object Identifier
—
Alternativní jazyky
Jazyk výsledku
angličtina
Název v původním jazyce
SAFETY FACTORS IN EFFORT ESTIMATION
Popis výsledku v původním jazyce
This contribution deals with problems related to an effort estimation of the software projects which are connected to the development of secured products. The aim of this contribution is to present an option of an effective consideration of the effort which is connected with the software products development. The FPA and COCOMO II methods for cost estimation are extended by the safety factors, which are considered depending on requested security level of the resulting software product.<br>The FPA methodextended by safety factors is called FPA&SF (Function Analysis & Safety Factors) and the extended COCOMO II method is named as COCOMO II&SF (COCOMO II & Safety Fac-tors). An example of determination of the effort estimation by new methods FPA&SF and COCOMO II&SF is part of this contribution. These methods are used on an actual project and the acquired re-sults are compared with values which were evaluated after a successful completion of the relevant project.<br>
Název v anglickém jazyce
SAFETY FACTORS IN EFFORT ESTIMATION
Popis výsledku anglicky
This contribution deals with problems related to an effort estimation of the software projects which are connected to the development of secured products. The aim of this contribution is to present an option of an effective consideration of the effort which is connected with the software products development. The FPA and COCOMO II methods for cost estimation are extended by the safety factors, which are considered depending on requested security level of the resulting software product.<br>The FPA methodextended by safety factors is called FPA&SF (Function Analysis & Safety Factors) and the extended COCOMO II method is named as COCOMO II&SF (COCOMO II & Safety Fac-tors). An example of determination of the effort estimation by new methods FPA&SF and COCOMO II&SF is part of this contribution. These methods are used on an actual project and the acquired re-sults are compared with values which were evaluated after a successful completion of the relevant project.<br>
Klasifikace
Druh
D - Stať ve sborníku
CEP obor
IN - Informatika
OECD FORD obor
—
Návaznosti výsledku
Projekt
—
Návaznosti
Z - Vyzkumny zamer (s odkazem do CEZ)<br>S - Specificky vyzkum na vysokych skolach
Ostatní
Rok uplatnění
2010
Kód důvěrnosti údajů
S - Úplné a pravdivé údaje o projektu nepodléhají ochraně podle zvláštních právních předpisů
Údaje specifické pro druh výsledku
Název statě ve sborníku
Information Systems Architecture and Technology - IT Models in Management Process
ISBN
978-83-7493-544-9
ISSN
—
e-ISSN
—
Počet stran výsledku
11
Strana od-do
—
Název nakladatele
Wroclaw University of Technology
Místo vydání
Wroclaw
Místo konání akce
Szklarska Poreba
Datum konání akce
19. 9. 2010
Typ akce podle státní příslušnosti
EUR - Evropská akce
Kód UT WoS článku
—